My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:57:46 PM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec'' <br /> consultants <br /> LIST OF ACRONYMS AND ABBREVIATIONS <br /> bgs below ground surface <br /> CSM conceptual site model <br /> CVRWQCB Central Valley Regional Water Quality Control Board <br /> DTSC California Environmental Protection Agency Department of <br /> Toxic Substances Control <br /> DWR California Department of Water Resources <br /> Geosyntec Geosyntec Consultants, Inc. <br /> GMWP Groundwater Monitoring Work Plan <br /> HASP Health and Safety Plan <br /> HSA hollow-stem auger <br /> Port Port of Stockton <br /> PVC polyvinyl chloride <br /> RRI Rough and Ready Island <br /> SJCEHD San Joaquin County Environmental Health Department <br /> SOPs Standard Operating Procedures <br /> USA Underground Service Alert <br /> USCS Unified Soil Classification System <br /> Work Plan Rail Line Well Destruction Work Plan <br /> Rail Line Area Well Destruction Work Plan iii April 27,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.