Laserfiche WebLink
Work Plan Addendum <br /> 26 January 2023 <br /> Page 2 <br /> construction details and Figure 1 shows the piezometer location in relation to the construction <br /> activities. <br /> Expedited approval from DTSC by January 31, 2023 to destroy P-108, is being requested such <br /> that a well destruction permit application can be submitted to San Joaquin County and a permit <br /> obtained to destroy P-108 by late February/early March 2023. P-108 needs to be destroyed to <br /> allow the construction activities currently ongoing to progress. The destruction of P-108 will be <br /> documented in the 2023 Groundwater Monitoring Report. <br /> Enclosure: Table 1: P-108 Construction Details <br /> Figure 1: P-108 Piezometer Location <br /> 2020_0424_RRI 2020 Monitoring Plan <br /> engineers I scientists I innovators <br />