Laserfiche WebLink
Geospte& <br /> consultants <br /> The results of the 2024 monitoring event will be provided in the 2024 Annual Groundwater <br /> Monitoring Report, which will be submitted to DTSC and the CVRWQCB within 90 days of <br /> completion of the 2024 groundwater monitoring and well maintenance field activities. The 2024 <br /> Annual Groundwater Monitoring Report will include summary tables of the groundwater results, <br /> figures with posted cis-1,2-DCE and vinyl chloride results and isoconcentration contours <br /> developed based on the professional judgement of a California licensed Professional Geologist, <br /> hydrographs, and groundwater monitoring well VOC concentration over time graphs. The <br /> hydrographs from 2023 will be updated in 2024 to exclude wells that have been destroyed. <br /> Additionally, the well location, repair, maintenance, and destruction activities described in <br /> Section 2 of this work plan will be documented in the 2024 Annual Groundwater Monitoring <br /> Report. The 2024 laboratory reports will be uploaded to GeoTracker when the 2024 Annual <br /> Groundwater Monitoring Report is submitted to DTSC and CVRWQCB. <br /> RRI 2024 Groundwater Monitoring Work Plan 15 June 13,2024 <br />