My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:57:46 PM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geospte& <br /> consultants <br /> The results of the 2024 monitoring event will be provided in the 2024 Annual Groundwater <br /> Monitoring Report, which will be submitted to DTSC and the CVRWQCB within 90 days of <br /> completion of the 2024 groundwater monitoring and well maintenance field activities. The 2024 <br /> Annual Groundwater Monitoring Report will include summary tables of the groundwater results, <br /> figures with posted cis-1,2-DCE and vinyl chloride results and isoconcentration contours <br /> developed based on the professional judgement of a California licensed Professional Geologist, <br /> hydrographs, and groundwater monitoring well VOC concentration over time graphs. The <br /> hydrographs from 2023 will be updated in 2024 to exclude wells that have been destroyed. <br /> Additionally, the well location, repair, maintenance, and destruction activities described in <br /> Section 2 of this work plan will be documented in the 2024 Annual Groundwater Monitoring <br /> Report. The 2024 laboratory reports will be uploaded to GeoTracker when the 2024 Annual <br /> Groundwater Monitoring Report is submitted to DTSC and CVRWQCB. <br /> RRI 2024 Groundwater Monitoring Work Plan 15 June 13,2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.