My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:57:46 PM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec° <br /> consultants <br /> 6. REFERENCES <br /> California Department of Toxic Substance Control (DTSC) and Central Valley Regional Water <br /> Quality Control Board(CVRWQCB). 2021. Final Remedial Action Plan for Soil, Landfill <br /> Area. September. <br /> Geosyntec Consultants, Inc. (Geosyntec). 2018. Groundwater Monitoring Work Plan, Rough and <br /> Ready Island, Port of Stockton, Stockton, California. 1 June. <br /> Geosyntec. 2019. Groundwater Monitoring Work Plan Addendum, 2019 Plan, Rough and Ready <br /> Island, Port of Stockton, Stockton, California. 20 May. <br /> Geosyntec. 2020 Draft 2020 Site Control Plan, Rough and Ready Island, Port of Stockton, <br /> Stockton, California. October 30. <br /> Geosyntec. 2021 a.Annual Groundwater Monitoring Report. Rough and Ready Island, Port of <br /> Stockton, Stockton, California. 17 December. <br /> Geosyntec. 2021b. Rail Line Area Monitoring Well Destruction Work Plan, Rough and Ready <br /> Island, Port of Stockton, California. 27 April. Geosyntec. 2022. 2022 Groundwater <br /> Monitoring Work Plan, Rough and Ready Island, Port of Stockton, Stockton, California. 7 <br /> June. Revised 21 October. <br /> Geosyntec. 2023a.Annual Groundwater Monitoring Report. Rough and Ready Island, Port of <br /> Stockton, Stockton, California. 31 March. <br /> Geosyntec. 2023b. Well Maintenance and Destruction Memorandum, 2023 Plan. 12 July. <br /> Kleinfelder. 1988. Verification Portion of the Confirmation Study/Final Draft Report,Naval <br /> Communication Station, Rough and Ready Island. February. <br /> PRC Environmental Management, Inc. (PRC). 1997a. Basewide Environmental Baseline Survey <br /> Report:Naval Communication Station Stockton, California. May. <br /> PRC. 1997b. Comprehensive Long-Term Action Navy (Clean 1): Surface Water and Sediment <br /> Site Investigation Volume YSite Investigation Report. September. <br /> PRC. 1997c. Comprehensive Long-Term Environmental Action Navy (Clean): Naval <br /> Communication Station Stockton, California Technical Memorandum Limited Investigation <br /> Site-3, Site-4, and IAS-11. August. <br /> State of California. 2003. Consent Agreement between the Port of Stockton, California, and the <br /> State of California Environmental Protection Agency, Department of Toxic Substances <br /> Control and the Regional Water Quality Control Board, Concerning the Former Naval <br /> Computer and Telecommunications Station, San Diego, Detachment Stockton. 30 July. <br /> Tetra Tech EM, Inc. (Tetra Tech). 2002. Comprehensive Long-Term Environmental Action Navy <br /> (Clean 2):Remedial Investigation Report Operable Unit 4. January. <br /> RRI 2024 Groundwater Monitoring Work Plan 16 June 13,2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.