My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2018-2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2018-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 11:04:10 AM
Creation date
10/3/2025 2:47:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2018-2023
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward, Inc. - 2 - 17 May 2023 <br /> Forward Landfill <br /> The side slope liner components of WMU FU-23 consist of the following, from top to <br /> bottom: <br /> • 12-inches thick operations layer <br /> • Geocomposite drainage net <br /> • Primary 60-mil textured HDPE geomembrane liner <br /> • Geosynthetic clay liner (GCL) <br /> • Subgrade <br /> The slope stability analysis for FU-23 evaluated the eastern slope grades for a <br /> maximum refuse elevation of 110 ft MSL. This is the maximum elevation that will be <br /> achieved prior to the development of adjacent waste management units. <br /> A Construction Quality Assurance Report (CQA report) shall be submitted upon <br /> completion of WMU FU-23. The discharge of waste to the new unit shall not commence <br /> until the CQA report is approved by Central Valley Water Board staff. <br /> On 9 May 2023, Central Valley Water Board staff requested additional information and <br /> revisions via electronic mail. On 15 May 2023, Lewis Engineering submitted "WMU FU- <br /> 23 Construction Drawings Revision 1" and addressed staff comments. Based on the <br /> additional information received, Central Valley Water Board staff concur that WMU FU- <br /> 23 adheres to the WDRs and Title 27. <br /> At least 48 hours prior to construction, Forward shall notify Central Valley Water Board <br /> staff the construction start date via email. If you have any questions regarding this <br /> correspondence, please contact Stephani Gisi at stephani.gisi(a)-waterboards.ca.gov or <br /> Brad Shelton at brad.shelton(o-)_waterboards.ca.gov. <br /> Sincerely, <br /> �+ Digitally signed by Brad <br /> Brad Shelton Date:2023.05.17 <br /> 15:18:43-07'00' <br /> Brad Shelton, P.G. <br /> Senior Engineering Geologist <br /> Title 27 Permitting and Mining Unit <br /> cc: Howard Hold, Central Valley Regional Water Board, Rancho Cordova <br /> Stephani Gisi, Central Valley Regional Water Board, Rancho Cordova <br /> Natalia Subbotnikova, San Joaquin County Environmental Health Department, <br /> Stockton <br /> Benjamin Wade, Area Manager, Republic Services Inc. <br /> Sangeeta Lewis, Lewis Engineering, Piedmont <br />
The URL can be used to link to this page
Your browser does not support the video tag.