Laserfiche WebLink
Table 1.Comments on Forward Landfill •'�IaRC1 ❑I S <br /> Review of Draft[Tentative]WDR and MRP <br /> Forward Landfill <br /> PDF <br /> MRP Page Page <br /> Item MRP Section MRP Item Number Number Number Topic Correction/Action Item <br /> Detection <br /> Monitoring <br /> 1 Program(DMP) Table 1 4 15 GWM Network One well is incorrectly listed as 9106-A.The well should be listed as 8106-A. <br /> Add'I Facility <br /> 3 Monitoring Table 28 32 43 LCRS In Row 3,add WMUs FU-19 and 23. <br /> E.6 Survey and Iso-Settlement Mapping was last submitted in 2021 therefore <br /> the next due date should be 2026.Deadlines for E.8(Forward Landfill Water <br /> Quality Protection Standard Reports)and E.9(Cannery Waste Water Quality <br /> Reporting Protection Standard Reports)should be extended to 2024 as the Tentative <br /> 2 Requirements Table 33 40 51 Reporting Deadlines WDR will be approved in mid-December 2023. <br />