Laserfiche WebLink
<br />3-14 <br /> <br />Note, since installation, there have been no significant problems with the FSL stormwater management / <br />drainage system in controlling runoff from the FSL site. <br />3.2.1 Final Cover System Corrective Action / Repair Costs <br />The following assumptions were made to assess the corrective action / repair costs for the FSL final cover <br />system impacted by the 1,000-year, 24-hour storm event — the CalRecycle precipitation causal event <br />BMP: <br /> Area of disturbed final cover requiring repair assumed equal to 10% of the total final cover <br />area equal to (674 acres) x (10%) = 67.4 acres <br /> Average depth beneath disturbed final cover area equal to 1-foot <br /> One-half (1/2) of the final cover area repaired will require excavation, and one-half (1/2) will <br />require fill <br /> Final cover area repaired will require final grading, seeding, mulch, and surveying <br />3.2.2 Stormwater Management / Drainage System Corrective Action / Repair <br />Costs <br />The following assumptions were made to assess the corrective action and associated repair costs for the <br />FSL stormwater management / drainage system impacted by the 1000-year, 24-hour storm event — the <br />CalRecycle precipitation causal event BMP: <br /> Area of disturbance requiring repair assumed equal to the total area of the three <br />sedimentation basins plus the perimeter drainage ditch equal to: <br />o Sedimentation Basins = (8.5 acres + 1.5 acres + 2.5 acres) = 12.5 acres, <br />o Perimeter Ditch = 2.5 acres (estimated total ditch length of 10,745 feet, and assumed <br />average width of 10 feet); <br /> Average depth of disturbance equal to 1-foot. <br /> One-half (1/2) of the disturbed area will require excavation, and one-half (1/2) will require fill. <br /> Disturbed areas will require final grading and surveying. <br /> <br />A corrective action cost of $1,574,772 was estimated for the Precipitation Causal Event. The detailed cost <br />breakdown is provided on Table 2, with stated assumptions and quantity takeoffs. <br />