My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3-18 <br /> <br />would be damaged, the below ground well casing of the LFG wells would remain intact and could be re- <br />extended. Therefore, the only damage to a LFG well would occur in the surface appurtenances. <br />A corrective action cost of $1,221,720 was estimated for the Fire Causal Event. The cost breakdown is <br />provided on Table 3. The corrective action cost assumes the following: <br /> 10,000 linear feet of landfill gas pipe impacted and therefore must be replaced. <br /> 20 wellhead assemblies impacted and therefore must be replaced. <br /> 20 well boots impacted and therefore must be replaced. <br /> Hookups of the 20 replacement wellheads to the GCCS piping must be made. <br /> 200 acres of the landfill vegetative cover (approximately 30% of the total final cover area) must <br />be restored after repairs made to GCCS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.