My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER R5-2015-0058-01 -33- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />FOOTHILL SANITARY LANDFILL, INC. <br />FOOTHILL LANDFILL <br />SAN JOAQUIN COUNTY <br /> <br />management unit.13 The plan scope consisted mostly of closing LF-2, given that at <br />closure, LF-2 would completely encircle LF-1, Module I’s closed top deck, less the <br />thickness of final cover soil to be applied. Proposed landfill closure activities would <br />include grading and final cover installation; modifications and improvements to the <br />landfill’s monitoring systems and LFG control facilities; and various site improvements <br />associated with landfill closure (e.g., drainage controls, demolition/decommissioning, <br />survey monuments, site security). <br />138. The plan anticipated installation of a 4.5 foot thick ET cover over LF-2 similar to that <br />installed on LF-1’s top deck in 2006, utilizing existing intermediate cover soil. For <br />preliminary planning purposes, the proposed ET cover would likely rely on the test pad <br />demonstration conducted at LF-1 for its EAD demonstration. The closed landfill (i.e., <br />LF-1 and LF-2) would be approximately square-shaped with a maximum final cover <br />elevation of 432 feet MSL occurring along the spine of a boot-shaped top deck. <br />Proposed final cover side slope grades (3.4H:1V) and setback from the site perimeter <br />(200 feet) would generally be the same as the interim cover slopes of completed <br />modules. The top deck would be graded to drain at a 6 % slope toward grass-lined <br />cover drains along the flanks of the unit that discharge to overside drains. Grass- lined <br />bench drains would collect sheet flow runoff from the landfill side slopes and direct it <br />to the overside drains. The overside drains would discharge to a series of large (12 <br />foot wide) drainage ditches connected to elongated storm water detention basins (100’ <br />wide x 500’ long) along the perimeter of the unit to reduce peak flow discharges. The <br />perimeter drainage system would discharge to the large storm water (i.e., stock) pond <br />in the southeast corner of the site. <br />139. The 30 July 2010 PC/PCMP did not include final cover slope stability analysis <br />because none of the proposed final cover slopes are steeper than 3H:1V and a <br />geosynthetic component is not being proposed as a component of the cover. See <br />Standard Closure and Postclosure Specification G.14, SPRR. Also, limited global <br />slope stability analysis conducted for the design of LF-2’s containment system <br />indicated that final cover slopes with an ET final cover would likely be stable in <br />accordance with the requirements of Title 27. See Finding 97.c. <br />140. The 30 July 2010 PC/PCMP did not include a specific plan for partial/phased landfill <br />closure; however, it indicated that the landfill would likely be closed in phases. <br />Phased closure would proceed once a sufficient number of adjacent expansion <br />modules had been developed to constitute a closable phase. The first closure phase <br />would not likely begin before the year 2024, however. These WDRs require that the <br />Discharger partially close LF-2, as feasible as the landfill is developed, per Title 27 <br />requirements. See Closure and Postclosure Specification E.4. <br /> <br /> <br /> <br /> <br />13. See 30 July 2010 Preliminary Closure and Postclosure Maintenance Plan, Foothill Sanitary Landfill, San <br />Joaquin County, prepared by Shaw Environmental, Inc. (Appendix B, JTD).
The URL can be used to link to this page
Your browser does not support the video tag.