My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER R5-2015-0058-01 -51- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />FOOTHILL SANITARY LANDFILL, INC. <br />FOOTHILL LANDFILL <br />SAN JOAQUIN COUNTY <br /> <br />13. At least 90 days prior to initiation of any new landfill modules or closure <br />construction activities under an FC/PCMP or Partial FC/PCMP, as approved by <br />the Executive Officer, the Discharger shall submit for review and approval all <br />applicable plans and reports, including, but not necessarily limited to, the <br />following: <br />a. Any proposed design modifications pertaining to construction or closure of the <br />unit, module, or phase per Construction Specification D.12. <br />b. A construction design report, including project specifications, drawings, <br />grading and design plans; and <br />c. A Construction Quality Assurance (CQA) Plan which satisfies the <br />requirements of Section 20324 of Title 27 as it applies to the construction of <br />the erosion-resistant and foundation layers. <br />Closure construction shall proceed only after the above (and any other <br />applicable) reports have been approved by Executive Officer. See also Standard <br />Construction Specification F.1, SPRR. <br />14. LFG extraction facilities necessary to control LFG shall be installed as each new <br />module is constructed and developed. New modules shall be tied into the <br />existing LFG extraction system in order to help control LFG. <br />15. The Discharger shall comply with all Standard Construction Specifications listed <br />in Section F of the SPRRs. <br />16. The Discharger shall comply with all Storm Water Provisions listed in Section L <br />of the SPRRs. <br />E. CLOSURE AND POST-CLOSURE MAINTENANCE SPECIFICATIONS <br />LF-1 <br />1. By 15 October 2016, the Discharger shall submit a revised Partial FC/PCMP for <br />closure the remainder of LF-1 consistent with the construction specifications <br />(e.g., Construction Specification D.5) and other applicable requirements of this <br />Order. The revised Partial FC/PCMP shall include plans for closure of all <br />portions of the unit that have not yet been closed (e.g., side slopes), and include <br />a description of closure activities, a schedule, and all other information required <br />under Title 27, section 21769(c). See Finding 136, Closure and Postclosure <br />Specification E.2, Provision H.9.b and Standard Closure and Postclosure <br />Specification G.8.
The URL can be used to link to this page
Your browser does not support the video tag.