WASTE DISCHARGE REQUIREMENTS ORDER R5-2015-0058-01 -52- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />FOOTHILL SANITARY LANDFILL, INC. <br />FOOTHILL LANDFILL <br />SAN JOAQUIN COUNTY <br /> <br />2. By 15 November 2018, the Discharger shall complete closure of unlined unit <br />LF-1 (i.e., Module I) and within 30 days thereafter submit a certification that the <br />landfill has been closed consistent with Standard Closure and Postclosure <br />Specification G.23, SPRR and Provision H.9.d of this Order. <br />LF-2 <br />3. By 15 March 2017, the Discharger submit a revised PC/PCMP for LF-2 <br />consistent with the revised Partial FC/PCMP submitted under these WDRs for <br />LF-1, as approved by the Executive Officer, and all other requirements of this <br />Order and Title 27, section 21769(b). The revised PC/PCMP shall include, but <br />not be limited to, the following: <br />a. A preliminary plan and timeline for partial/phased landfill closure; <br />b. A preliminary demonstration under Title 27, section 20080(b) for an EAD final <br />cover, if an EAD final cover is being proposed (see Closure and Postclosure <br />Specification E.5); and <br />c. Revised closure and postclosure financial assurance cost estimates, as <br />appropriate. <br />See Provision H.10 and Closure and Postclosure Specification E.4 below. <br />4. The operator shall to the extent feasible, based on site specific factors, <br />implement partial and/or partial final closure activities as the site operation <br />progresses, consistent with the closure of the entire site. See Title 27, section <br />21120(a). <br />Both Units <br />5. Landfill final cover designs proposed in preliminary or final closure plans <br />submitted under this Order shall be consistent with the prescriptive standard or <br />engineered alternative design (EAD) options specified in Finding 134 and <br />Construction Specification D.11. Any proposal for an EAD final cover included in <br />a FCP or Partial FCP shall be accompanied by the requisite demonstration under <br />Title 27, section 20080(b) and (c), including, but not limited to, a demonstration <br />that construction of the prescriptive standard is infeasible and that the proposed <br />EAD meets or exceeds Title 27 performance standards for final cover. Such <br />demonstration may require a field pilot project or test pad. <br />6. Any proposal for final cover included in the FCP or Partial FCP for the landfill <br />units shall meet the requirements of Title 27 and Subtitle D, including the <br />requirement that that the permeability of the LHC layer (or percolation rate <br />through proposed ET cover) be no greater than that of the base liner or <br />underlying natural geologic materials (whichever is less) in order to prevent <br />a “bathtub effect”. See Title 27, section 21090(a)(2) and 40 CFR <br />258.60(a)(1). <br />7. The Discharger shall obtain revised WDRs prior to closure with any other final <br />cover design than the design or designs approved in this Order.