Laserfiche WebLink
Item Description Units Unit Price Quantity Total Cost <br />6 ACCESS ROAD CONSTRUCTION <br />Perimeter Road Construction <br />Components: Purchase, Hauling and Placing Aggregate base. Assumed subgrade preparation is included in <br />construction of final cover. Road is approximately 15,000 feet long covering an area of 225,000 sf with 0.5 feet <br />of compacted aggregate base. <br />Class II AB ton 49.00$ 8160 399,840$ <br />Water Truck w/ Operator hr.209.50$ 41 8,590$ <br />Steel Drum Roller w/ Operator hr.225.13$ 41 9,231$ <br />Motor Grader w/ Operator hr. 319.18$ 41 13,086$ <br />Grade Checker hr. 125.90$ 41 5,162$ <br />Subtotal, Access Road 435,909$ <br />7 EROSION CONTROL AND VEGETATIVE LAYER <br />Erosion Control and Vegetative Layer <br />Components: Preparation of soil with hydroseeding, fertilizing, and mulching of final cover and disturbed <br /> soil surfaces. Area to be vegetated includes the final cover surface and the estimated disturbed area of <br />on-site borrow source for an estimated total of 826 acres. <br />Foreman hr.131.83$ 312 41,130$ <br />D4 Dozer w/ Operator hr.201.25$ 312 62,790$ <br />Vegetation (hydroseeding, mulching, fertilizing)ac 5,000$ 700 3,500,000$ <br />Grade Checker hr.125.90$ 312 39,281$ <br />Subtotal, Erosion Control and Vegetative Layer 3,643,201$ <br />ACCESS ROAD, EROSION CONTROL, AND VEGETATIVE LAYER <br />FOOTHILL SANITARY LANDFILL <br />Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsx Page 6 of 15