My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Description Units Unit Price Quantity Total Cost <br />8 SITE SECURITY, STRUCTURE REMOVAL, AND DECOMMISSIONING <br />Site Security, Structure Removal and Decommissioning <br />Components: Installation of fencing and installation of posted signs. Removal of structures. <br />No decommissioning of monitoring structures is anticipated. <br />Installation of Fencing and Signs lf 23.00$ 5000 115,000$ <br />Structure Removal sf 10$ 5500 55,000$ <br />Subtotal, Structure Removal 170,000$ <br />9 FINAL CLOSURE AND POST-CLOSURE MAINTENANCE PLAN <br />Components: Preparation of FCPCMP by a California registered/licensed engineer, <br />responding to agency comments. See costs shown in item 1E-1. <br />NA NA -$ <br />SITE SECURITY, STRUCTURE REMOVAL, DECOMMISSIONING, AND FINAL CLOSURE PLAN PREPARATION <br />FOOTHILL SANITARY LANDFILL <br />Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsx Page 7 of 15
The URL can be used to link to this page
Your browser does not support the video tag.