Laserfiche WebLink
Item Description <br />1 FINAL COVER <br />2 LEACHATE CONTROL SYSTEM <br />3 LANDFILL GAS MONITORING AND CONTROL <br />4 GROUNDWATER MONITORING <br />5 DRAINAGE CONTROL <br />6 ACCESS AND SITE SECURITY <br />7 EROSION CONTROL AND VEGETATIVE LAYER <br />8 SECURITY, STRUCTURE REMOVAL, AND DECOMMISSIONING <br />9 FINAL CLOSURE AND POST-CLOSURE MAINTENANCE PLAN1 <br />SUBTOTAL <br />TOTAL CLOSURE COST <br />Notes: <br />1 The cost for the Final Closure and Post-Closure Plan is included in the cost for Item 1E-1. <br />$96,400 <br />SUMMARY <br />FOOTHILL SANITARY LANDFILL <br />Total Cost <br />$170,000 <br />$34,358,328 <br />CONTINGENCY @20%$6,871,666 <br />$41,229,994 <br />$0 <br />$368,374 <br />$435,909 <br />$3,643,201 <br />$28,462,837 <br />$65,000 <br />$1,116,607 <br />Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsx Page 8 of 15