Laserfiche WebLink
Unit Total <br />Item Description Units Price Quantity Cost <br />1 FINAL COVER MAINTENANCE ac NA 674 <br />Components: Replace 6 inches of cover and re-vegetation of a portion of the final cover, and mowing of entire cover. <br />Foreman hr.131.83$ 104 13,710$ <br />Motor Grader w/Operator hr.432.41$ 104 44,971$ <br />Scraper w/ Operator hr.319.18$ 104 33,195$ <br />Pad foot Compactor w/ Operator hr.343.47$ 104 35,721$ <br />Water Truck w/ Operator hr.209.50$ 104 21,788$ <br />Grade Checker hr.126$ 104 13,094$ <br />Mowing ac 259.00$ 674 174,566$ <br />Vegetation (hydroseeding, mulching, fertilizing)ac 4,992$ 23 114,816$ <br />Total Cost 451,861$ <br />2 LEACHATE CONTROL AND MONITORING <br />Components: Leachate management cost per gallon for 6,000 gallons annually. Sampling and testing of leachate on a quarterly basis. <br />Operation, Maintenance, and Disposal sump 14,691.00$ 10 146,910$ <br />Subtotal, Pumping and Treatment Cost 146,910$ <br />Sampling and Reporting sample 652$ 10 6,520$ <br />Testing sample 906$ 10 9,060$ <br />Subtotal, Annual Monitoring Cost 15,580$ <br />Total Annual Cost 162,490$ <br />TABLE C-2 <br />PRELIMINARY POST- CLOSURE OPERATIONS AND MAINTENANCE COST ESTIMATE <br />FOOTHILL SANITARY LANDFILL <br />August 28, 2025 <br />Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsx Page 10 of 15