My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unit Total <br />Item Description Units Price Quantity Cost <br />1 FINAL COVER MAINTENANCE ac NA 674 <br />Components: Replace 6 inches of cover and re-vegetation of a portion of the final cover, and mowing of entire cover. <br />Foreman hr.131.83$ 104 13,710$ <br />Motor Grader w/Operator hr.432.41$ 104 44,971$ <br />Scraper w/ Operator hr.319.18$ 104 33,195$ <br />Pad foot Compactor w/ Operator hr.343.47$ 104 35,721$ <br />Water Truck w/ Operator hr.209.50$ 104 21,788$ <br />Grade Checker hr.126$ 104 13,094$ <br />Mowing ac 259.00$ 674 174,566$ <br />Vegetation (hydroseeding, mulching, fertilizing)ac 4,992$ 23 114,816$ <br />Total Cost 451,861$ <br />2 LEACHATE CONTROL AND MONITORING <br />Components: Leachate management cost per gallon for 6,000 gallons annually. Sampling and testing of leachate on a quarterly basis. <br />Operation, Maintenance, and Disposal sump 14,691.00$ 10 146,910$ <br />Subtotal, Pumping and Treatment Cost 146,910$ <br />Sampling and Reporting sample 652$ 10 6,520$ <br />Testing sample 906$ 10 9,060$ <br />Subtotal, Annual Monitoring Cost 15,580$ <br />Total Annual Cost 162,490$ <br />TABLE C-2 <br />PRELIMINARY POST- CLOSURE OPERATIONS AND MAINTENANCE COST ESTIMATE <br />FOOTHILL SANITARY LANDFILL <br />August 28, 2025 <br />Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsx Page 10 of 15
The URL can be used to link to this page
Your browser does not support the video tag.