My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 MONITORING AND LANDFILL GAS CONTROL <br />Groundwater and Surface Water Monitoring <br />Components: Quarterly Groundwater Monitoring at 8 wells plus two stormwater outlet locations. <br />Annual Sampling, Testing, and Reporting sample 6,590$ 24 158,160$ <br />Subtotal, Annual Monitoring Cost 158,160$ <br />Five-Year Monitoring and Report of Constituents of Concern Analysis <br />Components: This is a five year requirement that is included above. LS -$ 1 -$ <br />Subtotal, Five-Year Monitoring -$ <br />Annual Cost, 1/5 -$ <br />Groundwater Monitoring Well Repairs <br />Components: Well Repairs, including replacement of the protective steel covers twice over 30 yrs. on all groundwater monitoring <br />wells. <br />Steel Covers ea.100$ 24 2,400$ <br />Keyed-alike Locks ea.25$ 24 600$ <br />Misc. Supplies (i.e. cement, paint, etc.)ea.250$ 24 6,000$ <br />Field Technician(Environmental Specialist)hr.153.00$ 72 11,016$ <br />Project Manager/Engineer/Geologist hr.224.00$ 16 3,584$ <br />Subtotal Groundwater Well Maintenance and Repairs 23,600$ <br />Landfill Gas Monitoring <br />Components: Quarterly Landfill Gas Monitoring and Reporting <br />Surface Emission Monitoring ls 69,831$ 1 69,831$ <br />Sampling and Reporting ls 7,201$ 1 7,201$ <br />Testing ls 9,053$ 1 9,053$ <br />Subtotal, LFG Monitoring Event 86,085$ <br />Landfill Gas System Operation and Maintenance <br />Components: Annual system and monitoring probe maintenance and repairs. <br />Landfill Gas System Maintenance and Operation ls 1,812,995$ 1 1,812,995$ <br />Subtotal Landfill Gas System Maintenance and Operation 1,812,995$ <br />Vadose Zone Monitoring <br />Components: Annual Vadose Zone Monitoring and Reporting <br />Sampling and Reporting ea.163$ 20 3,260$ <br />Testing ea.259$ 20 5,180$ <br />Subtotal, Vadose Zone Monitoring Event 8,440$ <br />Total Cost for Monitoring and Landfill Gas Control 2,112,880$ <br />Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsx Page 11 of 15
The URL can be used to link to this page
Your browser does not support the video tag.