My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Foothill Sanitary Landfill Page 49 of 53 San Joaquin County DPW - Solid Waste <br />Joint Technical Document Revised 6/09/2020 <br /> <br />Leachate in Module 1 drains by gravity to the sump located in the southeast corner of the <br />module, from which it is pumped either to the 10,000-gallon storage tank or returned to the <br />refuse over an approved liner in accordance with the WDRs. Leachate generated from Module 1 <br />flows to a leachate sump from which it is pumped either to a storage tank or to infusion points <br />installed in the refuse filled areas in accordance with the WDRs. <br /> <br />Leachate from the storage tanks of future modules is ultimately returned back to the waste in <br />the same lined module in accordance with the regulations. <br /> <br />The public is not allowed to enter or be near any of the leachate control facilities of the site. Site <br />personnel monitor any breaches in security. Infusion points are designed and installed away for <br />active phase areas. Application of leachate directly to the refuse is away from public access <br />areas.
The URL can be used to link to this page
Your browser does not support the video tag.