2024 ANNUAL GROUNDWATER MONITORING REPORT <br /> TEICHERT AGGREGATES AND GRANITE CONSTRUCTION <br /> VERNALIS AREA <br /> • Turbidity: YSI Pro DSS instrumentation or Oakton T-100 portable turbidity meter <br /> The calibration and maintenance of instrumentation is conducted following the manufacturers' <br /> instructions and guidelines using appropriate standard solutions and procedures and at manufacturer <br /> recommended intervals.The electrical sounder and temperature probe are factory calibrated and do <br /> not require calibration by the user. <br /> Samples are collected in laboratory-supplied bottles with no headspace. Bottles are labeled with <br /> laboratory-supplied labels, immediately placed on ice,and kept in a dark ice chest for transport to the <br /> laboratory. <br /> 4 MONITORING RESULTS <br /> Quarterly groundwater level and quality monitoring commenced in March 1994 to characterize pre- <br /> mining groundwater conditions in the area and facilitate the continued evaluation of local groundwater <br /> conditions.Also,as part of Teichert and Granite's approved plan to dry-pit mine,groundwater level <br /> monitoring provides the necessary information to establish and maintain a buffer between the base of <br /> mining and groundwater. Mining of the Teichert Vernalis Central phases began in 1998 and has <br /> proceeded to varying depths up to 150 feet bgs through phase 4,with phases 2 through 4 currently used <br /> as siltation ponds.Currently,the mining of the Teichert Vernalis West and East phases has progressed to <br /> an approximate depth of 170 feet bgs in phase A5.Active mining operations in Phase Al began in 2023 <br /> and has progressed to an approximate depth of 90 feet bgs.Granite has completed mining of Phase 1 to <br /> a depth of 150 feet and has reclaimed Phase 1 with pond fines. In 2023,Granite Vernalis completed <br /> mining the southern portion of Phase 2 to 150 feet,which is now being backfilled with pond fines and <br /> washout for use as a settlement pond.Currently,the early stages of Phase 3 operations are underway, <br /> with the southeastern sections being mined to the depths of 75 feet. <br /> 4.1 Groundwater Levels <br /> Long-term fluctuations of shallow groundwater levels in the area are depicted by the hydrograph for <br /> Well 4S/6E-5A1(Figure 4),which has been monitored semi-annually by the California Department of <br /> Water Resources (DWR)from 1960 through 2020(typically in the winter, i.e.,January, February,or <br /> March; and in late summer/early fall, i.e., in September or October)and quarterly for Teichert's quarry <br /> excavation monitoring program since 1994. The lowest historic water level, i.e., 69 feet above mean sea <br /> level (msl),was recorded in early 1962, at the end of two consecutive critically dry years (DWR Water <br /> Year Hydrologic Classification Index for the San Joaquin Valley)'.Water levels recovered subsequently to <br /> a high of 90.9 feet (msl) in December 1969. During this early period, seasonally high-water levels ranged <br /> from approximately 86 to 89 feet (msl)and seasonally low elevations typically ranged from 81 to 85 feet <br /> (msl).Water levels declined about 5 feet during the 1976-77 drought and then recovered in the late <br /> 1970s and early 1980s to reach the highest water levels on record during the wet period of 1982-86(i.e., <br /> 'http://cdec.water.ca.gov/reportapp/javareports?name=wsIHIST <br /> LUHDORFF&SCALMANINI <br /> CONSULTING ENGINEERS 5 <br />