My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005871
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
34443
>
2600 - Land Use Program
>
SU0005871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 3:12:15 PM
Creation date
10/27/2025 3:44:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
File Section
RECORDED DOCUMENTS
RECORD_ID
SU0005871
STREET_NUMBER
34443
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
APN
25328002
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
34443 S BIRD RD
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2024 ANNUAL GROUNDWATER MONITORING REPORT <br /> TEICHERT AGGREGATES AND GRANITE CONSTRUCTION <br /> VERNALIS AREA <br /> obstructed depth. From February 2021 to February 2022,the obstruction was no longer present and <br /> water level measurements were successfully obtained. In spring 2022, an airline was installed to an <br /> unknown depth and since then, pressure readings have been collected. <br /> Brown's New production well.An airline was installed in the Brown's New well to obtain water levels, <br /> but it was destroyed by wildlife in spring 2018 making the well inaccessible for water level <br /> measurements.The airline was repaired, and pressure readings were obtained in 2019 and spring 2020. <br /> In summer 2020,the pump was temporarily removed,and a water level was obtained. By fall 2020,the <br /> pump was re-installed, however there was no longer an airline and no access to the well for water level <br /> measurements. In 2021,the well was accessible for water level measurements, however,the well has <br /> been pumping during most monitoring campaigns. From 2021 to May 2024, an electric water level <br /> sounder was deployed to a depth of 450 feet bgs without encountering groundwater. Starting in August <br /> 2024,an acoustic sounder has been used to measure groundwater levels. <br /> Brown's#1 production well. In August 2023, it was discovered that the airline on Brown's#1 well had <br /> been cut by what appeared to be weed abatement equipment.Water level measurements have been <br /> unattainable in the well since August 2023. <br /> Granite#5 production well. In 2019,the Granite#5 production well was incorporated into the <br /> monitoring program. Pressure readings were obtained in its airline but due to a leak in the airline,the <br /> pressure readings are not usable. In fall 2021,the pump was removed from the well and there was no <br /> access for a water level measurement due to a rubber hose,with unknown use, being placed into the <br /> sounding pipe.Starting in August 2024, an acoustic sounder has been used to measure groundwater <br /> levels. <br /> Blewett Road domestic well. In May 2024,a domestic well along Blewett Road and east of the Teichert <br /> Aggregate facility was incorporated into the monitoring network. Since then,water levels have been <br /> collected through the use of electrical and acoustic water level sounders. <br /> The groundwater quality network consists of 2 wells upgradient from the Vernalis plant(Hall and <br /> Faulkner domestic wells), 1 well onsite (South Tracy#3 production well),and 2 downgradient wells <br /> (Granite#5 and Brown's New production wells) (Figure 3).The monitoring network has experienced <br /> modifications over time. For example,the South Tracy#3 production well was added to the water <br /> quality network in 2004 in lieu of the Brown's New well,which became inoperable in 2001(due to the <br /> removal of the pump).With Granite's commencement of mining activities,the Brown's New well was <br /> equipped with a pump again and was incorporated back into the monitoring program in 2009 as a <br /> replacement for the South Tracy#1 well. Further,from 2006 to spring 2018,the Granite#3 well <br /> replaced the Brown's#1 well for water quality monitoring purposes,as the Brown's#1 well was <br /> vandalized in 2005. In 2019,Granite#3 was no longer in operation and was replaced with Granite#5 for <br /> water quality monitoring purposes. From 1994 to 1997,the Koster irrigation well was sampled <br /> periodically(depending on the availability of a tractor engine for the pump). <br /> LUHDORFF He SCALMANINI <br /> CONSULTING ENGINEERS 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.