Laserfiche WebLink
TABLE OF CONTENTS 1.0 INTRODUCTION <br /> 1.111 INTRODUCTION..................................................................................I..........................1 <br /> On behalf of Nu[nen Ag Solutions,Inc.(Nutrient),Rubik is submitting this Monitoring Well Network <br /> 1.1 Objecdve.......................................................................................................................................1 Replacement Work Plan forthe facility located at 35100 South Highway 33 in Vernalis,California <br /> 1.2 Chemicals of Concern...................................................................................................................1 (site, Figure 1). This work plan was requested by the Central Valley Regional Water Quality <br /> 2.0 SITE DESCRIPTION.........................................._...........................................................1 Control Board(RWQCB)during their April 8,2020 meeting with Nutrien. <br /> 3.0 GEOLOGY AND HYDROGEOLOGY..............................................................................1 1.1 Objective <br /> 4.0 ENVIRONMENTAL BACKGROUND..............................................................................1 <br /> The objective of this project is to replace the monitoring well network at the she due to detaining <br /> S.D PROPOSED MONITORING WELL DESTRUCTION AND INSTALLATION...................2 groundwater levels in the current wells. <br /> i� 5.1 Pemliting......................................................................................................................................2 <br /> 5.2 Health and Safety Plan.................................................................................................................2 1.2 Chemicals of Concern <br /> 5.3 Utility Clearance............................................................-..............................................................2 <br /> 5.4 Monitoring Well Destruction............................................................................................._......._-2 The primary chemicals of concern (COCs) in groundwater are nitrate, 1,2-tlichloropropane <br /> 5.5 Monitoring Well Installation...........................................................................................................3 (1,2-DCP),and 1,2,3-trichloropropane(1,2,3-TCP). <br /> 5.6 Well Development..............................................................................................................I..........3 <br /> 5.7 Well Survey........................................................................--.......................................................3 2.0 SITE DESCRIPTION <br /> 5.8 Decontamination and Waste Management...................................................................................3 <br /> on Figure <br /> 5.9 Scheduling and Reporting-.......---.... .----^•^^--- ^^^•^-.----^"""."""""'3 The site Is used for sales of bulk liquid and dry fertilizers and liquid peril and pre-packaged <br /> fertilizers and pesticides.Current and former she features are shown Figure 2. <br /> 3.0 GEOLOGY AND HYDROGEOLOGY <br /> FIGURES The soil beneath the site consists primarily of day from the ground surface to approximately 25 <br /> Figure 1 Site Vicinity Map feet below the ground surface (bgs).The clay is underlain by discontinuous layers of sand, silt, <br /> Figure 2 Site Map and clay to at least 75 feet bgs,the maximum depth explored. Cross section path locations are <br /> Figure 3 Cross Section Location Map shown on Figure 3 and geologic cross sections are included as Figures 4 and S. <br /> Figure Geologic Cross Section A-A' <br /> Figure 5 Geologic Cross Section B-B' She monitoring wells are installed to between 45 and 50 feet bgs with between 20 and 24 feet of <br /> Figure 6 Groundwater Elevation Contours-February 2020 screen. In February 2020, depth to groundwater in the monitoring wells was approximately 45 <br /> Figure 7 Groundwater Analytical Results-February 2020 feet bgs. Groundwater elevations have decreased approximately 15 feet since 2013 and wells <br /> Figure 8 Proposed Groundwater Monitoring Well Network MW-4, MW-5, and MW-7 have been dry since 2018. The water column height in the wells that <br /> Figure 9 Proposed Well Construction Details contained water in February 2020 ranged from approximately 1 to 6 feet. <br /> Groundwater predominantly flows to the east at an average gradient of 0.0006 feet per foot <br /> �^ TABLES Monitoring well locations are shown on Figure 2 and construction details are summarized in <br /> Table 1 Monitoring Well Construction Details Table 1.Historical groundwater elevation data are provided in Table 2 and groundwater elevation <br /> Table 2 Historical Groundwater Elevation Data contours from the February 2020 event are shown on Figure S. Graphs depicting the depth to <br /> groundwater over time in the wells are included as Appendix A. <br /> Table Historical Groundwater Analytical Data <br /> 4.0 ENVIRONMENTAL BACKGROUND <br /> APPENDICES <br /> Groundwater beneath the site has been monitored and sampled since 1997. Concentrations of <br /> Appendix A Depth to Groundwater and COC Concentration vs Time Graphs the COCs in groundwater beneath the she have historically exceeded their respective MCLs in <br /> some of the wells,including wells that have gone dry.The February 2020 groundwater analytical <br /> Nutran Nvlden vemal*CiulMmia �� MoniWng Well Nea mid 1 T2¢Gili <br /> Monitoring Well Nerw rk Replemme ,Work Plan Moniroring Well Nehwrk Replemment Work Plan <br />