My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HIGHWAY 33
>
35100
>
2900 - Site Mitigation Program
>
PR0506447
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 11:07:39 AM
Creation date
11/12/2025 11:04:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506447
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0007429
FACILITY_NAME
NUTRIEN VERNALIS FACILITY
STREET_NUMBER
35100
Direction
S
STREET_NAME
HIGHWAY 33
City
VERNALIS
Zip
95385
APN
25518008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
35100 S HIGHWAY 33 VERNALIS 95385
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
results are shown on Figure 7 and historical groundwater analytical results are summarized in bottom of the borehole to approximately 5 feet bgs.Sand will be placed in the remaining annulus <br /> Table 3.Graphs comparing CDC concentrations over time are included as Appendix A. to the ground surface and completed to match the surrounding surface conditions. <br /> 5.0 PROPOSED MONITORING WELL DESTRUCTION AND INSTALLATION 5.5 Monitoring Well Installation <br /> The current monitoring well network will be destroyed and replaced with wells installed to 65 feet Monitoring wells will be installed using a hollow stem auger drilling rig. During drilling,soil cores <br /> bgs.The proposed monitoring well network modifications are summarized below and shown on will be collected using a split-spoon sampler every 5 feet and logged in accordance with the <br /> Figure 6: Unified Soil Classification System.The wells will be constructed or 2-inch diameter Schedule 40 <br /> polyvinyl chloride(PVC)casing with 20 feet of 0.010-inch factory-slotted screen from 45 to 65 feet <br /> • Well destructions:MW-1,MW-2,MW-3,MW-4,MW-5,MW-6R,MW-7,and MW-6 bgs.The annular space between the borehole walls and well screens will be backfilled with a <br /> silica sand filter pack to approximately 2 feet above the top of the well screen.A 2-foot bentonite <br /> • Well installations:MNA2R,MW-3R, MW-4R,MW-SR,and MW-6R transition seal will be installed above the filter pack and hydrated in place.A neat cement sanitary <br /> Well MW-1 will not be replaced because CDC concentrations are historically below water quality seal will be installed from the top of the bentonite seal to just below the ground surface. <br /> standards,the well is no longer included in the monitoring and sampling program,and the well is Wells MW-5R and MW-eR will be completed with a flush mount traffic-rated well box. The <br /> not needed to evaluate the groundwater flow direction.Additionally,wells MW-SR and MW-7 will remaining wells will be completed in an aboveground monument set in a concrete pad. The <br /> not be replaced because the proposed well MW-2R i Wit provide representative data at the same proposed monitoring well construction details are shown on Figure 9. <br /> location. <br /> 5.1 Permitting <br /> 5.6 Well Development <br /> In accordance with California Well Standards(Department of Water Resources Bulletin 74),the <br /> Well installation and destruction permits will be obtained from the San Joaquin County M wells will be developed a minimum of 46 hours after installation by a combination of bailing, <br /> Environmental Health Department (SJCEHD) prior to the start field work. Encroachment surging, and pumping. The total well depth, depth to groundwater, temperature, pH, specific <br /> permits will also be obtained from SJC for the replacement of wells W-5 and MW-8 along Welty conductivity, dissolved oxygen, and oxidation-reduction potential will be measured prior to the <br /> Road.Rubik will notify the SJCEHD and RWQCB at least 46 hours prior to the field work. start and periodically during development. Development will continue until a minimum of five <br /> 5.2 Health and Safety Plan casing volumes of water have been removed and water quality parameters have stabilized. <br /> A site-specific Health and Safety Plan(HASP)will be reviewed and signed by all field personnel, 5.7 Well Survey <br /> including subcontractors,pdorto work initiation.The HASP will identify potential health and safety The location, ground surface elevation, and top of casing elevation will be measured by a <br /> hazards for each phase of site work and include requirements and procedures for protection.The California-licensed Professional Land Surveyor in accordance with the requirements for the State <br /> HASP will be maintained onsite during the field activities. A traffic management plan for work Water Resources Control Board Geotracker database. <br /> performed along Welty Road will be developed and included in the SJC encroachment permit. <br /> 6.3 Utility Clearance 5.6 Decontamination and Waste Management <br /> Down-hole drilling equipment will be decontaminated prior to drilling each well using high- <br /> Underground Service Alert(USA)will notified a minimum of46 hours in advance of subsurface pressure cleaning equipment. The decontamination rinsate, well development water, and soil <br /> activities to identify underground utilities.l A private utility locator will also perform a geophysical cuttings generated during drilling will be placed into separate roll-off boxes or 55-galion drums <br /> survey tithe vicinity of each drilling location to identify potential utilities or other subsurface and labeled,dated,and staged on site prior to characterization and disposal at an appropriate off- <br /> obstructions. If factlity personnel, data from previous borings, and/or the utility clearance site facility. <br /> contractor are unable to verify a location is utility free, a hand auger will be advanced to <br /> approximately 5 feet bgs prior to drilling to manually clear the location. 5.9 Scheduling and Reporting <br /> 5.4 Monitoring Well Destruction Feld activities will be initiated after receiving the RWQCB's authorization to proceed and obtaining <br /> The well casing and annular seal will be destroyed by overdrilling to 2feet below the constructed well drilling and encroachment permits.A Monitoring Well Network Replacement Report will besubmitted approximately 8 weeks after completing the field activities.At a minimum,the report <br /> depth using a hollow stem auger drilling rig in accordance with SJCEHD requirements. The will contain: p <br /> resulting annular space will be sealed using neat cement delivered through a tremie pipe from the <br /> Monitoring We'll Neatwoik Replacement Work Phan Z 2.Ld. Nuaien ni; nal*Well ea r, a 3 ;266f� <br /> Monitodng Well NelveB Replacement Work Phan <br />
The URL can be used to link to this page
Your browser does not support the video tag.