Laserfiche WebLink
Quarterly Monitoring Report – Third Quarter 2025 <br />www.arcadis.com <br />Forward Landfill 3Q25 Quarterly Mon Report 7 <br />3.2 Unsaturated Zone Corrective Action <br />The MRP, Section C.2 and Table 18 (RWQCB 2024), requires additional analysis of dissolved inorganic <br />constituents and metals for unsaturated zone lysimeters FU-04, FU-05, FU-06, and FU-10 semiannually (first and <br />third quarters). Lysimeter FU-10 is listed in the MRP’s Unsaturated Zone Corrective Action Monitoring Table <br />(MRP Table 18 [RWQCB 20224]); however, no historical data exist for this location, and it is not included in the <br />previous WDRs Order No. R5-2014-0006 (RWQCB 2014). The inclusion of this sampling location was a <br />typographical error; therefore, the proposed corrective action is for this location to be removed from the MRP in <br />the next revision. All analytical results for the unsaturated zone lysimeters are presented in Tables 5a and 5c. <br />3.3 Groundwater Extraction Treatment System <br />The groundwater treatment system (GWTS) at the Site has been operating since 1994 to mitigate VOC impacts in <br />groundwater. The GWTS currently operates in accordance with WDR Order No. R5-2003-0080 (RWQCB 2003). <br />The monitoring and reporting of the extraction wells is in accordance with the WDR and MRP Order No. R5-2024- <br />0002 (RWQCB 2024). The MRP Table 19 (RWQCB 2024) lists six groundwater extraction wells as part of the <br />GWTS (EW-1, EW-2, EW-3R, EW-4, EW-5, and CDCR-EW-1). Five of the six groundwater extraction wells listed <br />in Table 19 of the MRP (EW-1, EW-2, EW-3R, EW-4, and EW-5) are monitored monthly as they are the only <br />extraction wells that are part of an operational remedial system. Extraction well CDCR-EW-1 is currently not part <br />of an operational remedial system and, therefore, is not monitored monthly. Additional offsite extraction wells <br />(CDCR-EW-2, CDCR-EW-3, CDCR-EW-4, and CDCR-EW-5) are not included in the MRP and are not connected <br />to an operational remedial system and, therefore, historically have not been monitored monthly. However, these <br />five offsite extraction wells were added to the routine quarterly monitoring program in second quarter 2025 and <br />the analytical results for third quarter 2025 are included in Tables 3a and 3b. <br />During third quarter 2025, the GWTS was inspected and monitored bi-weekly by Del-Tech during July, August, <br />and September. Operational details are documented in the Quarterly Corrective Action Progress Report – Third <br />Quarter 2025 (Arcadis 2025d) and the Groundwater Treatment System Monitoring Report for third quarter 2025 <br />(Arcadis 2025e). <br />3.4 Landfill Gas Corrective Action <br />The landfill gas corrective action system is outlined in the MRP, Section C.4 and Tables 20 through 24 (RWQCB <br />2024). <br />The results of landfill gas monitoring of the landfill gas collection and control system, onsite structures, and <br />perimeter gas probes conducted at the Site during third quarter 2025 are presented in the Quarterly Corrective <br />Action Progress Report – Third Quarter 2025 (Arcadis 2025d). <br />In accordance with the Cleanup and Abatement Order (R5-2017-0703; RWQCB 2017a) and based on <br />exceedances measured during the year, samples were collected on September 16, 2025, for laboratory testing by <br />USEPA Method TO-15.VOC detection results are presented in the Quarterly Corrective Action Progress Report – <br />Third Quarter 2025 (Arcadis 2025d). According to Geosyntec Consultants, the landfill gas collection and control <br />system operated continuously with minimal downtime during third quarter 2025 (Arcadis 2025d).