27 August 2025 AdvancedGeo <br /> Project No. 25-8011 An Employee—Owned Company <br /> Page 7 of 14 Q,%a X <br /> holes are shown in Figure 2, with detailed field data provided in Appendix D. <br /> 6.1. NUMBER OF PERCOLATION TESTS PERFORMED <br /> Two shallow percolation tests were performed at the site. The first test (14 August 2025) <br /> failed due to infiltration occurring too rapidly. The second test (22 August 2025) was <br /> relocated further south on the property and yielded an acceptable percolation rate. <br /> 6.2. CONSTRUCTION OF PERCOLATION TEST HOLE <br /> First Test (13-14 August 2025): A4-inch diameter hand auger was used to advance the <br /> borehole to 42 inches bsg. After pre-soaking, the test was performed on 14 August 2025. <br /> The borehole drained too rapidly, resulting in a failed test. <br /> Second Test (21-22 August 2025): A second borehole was advanced approximately 20 <br /> feet south of the first location to a depth of 42 inches bsg. A 2-inch PVC slotted casing <br /> was installed with gravel backfill. After 24-hour pre-soak, the percolation test was <br /> successfully completed on 22 August 2025. <br /> 6.3. DESCRIPTION OF THE PERCOLATION TEST HOLE - POST SOAK <br /> During the August 2025 tests, the boreholes were found to be completely dry, intact and <br /> in good condition after the 24-hour soaking period. <br /> 6.4. PERCOLATION TEST CONFORMED TO SJC POLICY EHD 98-02 <br /> Testing followed the requirements of San Joaquin County Division 11, Section <br /> 91105.2(d). For the successful test on 22 August, Procedure #2 was attempted first but <br /> failed due to rapid infiltration. Procedure #3 was then conducted, involving water level <br /> measurements at 10-minute intervals over one hour. Water levels were measured with <br /> a Solinst water level meter from a fixed reference point at the top of the casing. Results <br /> were confirmed by the EHD inspector. <br /> 6.5. COMPLETED PERCOLATION TEST FORM <br /> After completion of the test, the EHD inspector reviewed the field data and signed the <br /> required EHD Percolation Test Rate form. Field measurements recorded during the test <br /> are included on the Percolation Test Rate Field Sheet provided in Appendix D. <br /> 6.6. POTENTIAL PROBLEMS PREDICTED <br />