My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2500946_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PRIEST
>
9128
>
2600 - Land Use Program
>
SU-2500946_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2025 9:11:04 AM
Creation date
12/16/2025 8:55:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU-2500946
PE
2602 - SOIL SUITABILITY AND NITRATE LOADING STUDY REVIEW
STREET_NUMBER
9128
Direction
S
STREET_NAME
PRIEST
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19322078
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
9128 S PRIEST RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 August 2025 AdvancedGeo <br /> Project No. 25-8011 An Employee—Owned Company <br /> Page 7 of 14 Q,%a X <br /> holes are shown in Figure 2, with detailed field data provided in Appendix D. <br /> 6.1. NUMBER OF PERCOLATION TESTS PERFORMED <br /> Two shallow percolation tests were performed at the site. The first test (14 August 2025) <br /> failed due to infiltration occurring too rapidly. The second test (22 August 2025) was <br /> relocated further south on the property and yielded an acceptable percolation rate. <br /> 6.2. CONSTRUCTION OF PERCOLATION TEST HOLE <br /> First Test (13-14 August 2025): A4-inch diameter hand auger was used to advance the <br /> borehole to 42 inches bsg. After pre-soaking, the test was performed on 14 August 2025. <br /> The borehole drained too rapidly, resulting in a failed test. <br /> Second Test (21-22 August 2025): A second borehole was advanced approximately 20 <br /> feet south of the first location to a depth of 42 inches bsg. A 2-inch PVC slotted casing <br /> was installed with gravel backfill. After 24-hour pre-soak, the percolation test was <br /> successfully completed on 22 August 2025. <br /> 6.3. DESCRIPTION OF THE PERCOLATION TEST HOLE - POST SOAK <br /> During the August 2025 tests, the boreholes were found to be completely dry, intact and <br /> in good condition after the 24-hour soaking period. <br /> 6.4. PERCOLATION TEST CONFORMED TO SJC POLICY EHD 98-02 <br /> Testing followed the requirements of San Joaquin County Division 11, Section <br /> 91105.2(d). For the successful test on 22 August, Procedure #2 was attempted first but <br /> failed due to rapid infiltration. Procedure #3 was then conducted, involving water level <br /> measurements at 10-minute intervals over one hour. Water levels were measured with <br /> a Solinst water level meter from a fixed reference point at the top of the casing. Results <br /> were confirmed by the EHD inspector. <br /> 6.5. COMPLETED PERCOLATION TEST FORM <br /> After completion of the test, the EHD inspector reviewed the field data and signed the <br /> required EHD Percolation Test Rate form. Field measurements recorded during the test <br /> are included on the Percolation Test Rate Field Sheet provided in Appendix D. <br /> 6.6. POTENTIAL PROBLEMS PREDICTED <br />
The URL can be used to link to this page
Your browser does not support the video tag.