My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2026 9:12:10 PM
Creation date
1/14/2026 9:10:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231072
PE
2361 - UST FACILITY
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2705 COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: NIA <br /> ❑ Check this box if Appendix 8.1 continuation page is attached. <br /> Tank ID <br /> Tank Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading I <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass❑ Fail ❑Pass❑ Fail ❑Pass❑ Fail ❑ Pass❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type 0 Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used:0-10 Psi Gauges <br /> ❑ Check this box if Appendix 8.2 continuation page is attached. <br /> Pipe Run ID 91 <br /> Pipe Manufacturer Smith <br /> Test Start Time 1:00 pm <br /> Initial Reading 5 psi <br /> Test End Time 2:00 pm <br /> Final Reading 5 psi <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 <br /> Tightness Test Results ❑✓ Pass❑Fail ❑Pass El Fail ❑Pass❑Fail ❑Pass❑ Fail <br /> Continuity Test Results ❑✓ Pass ❑Fail ❑Pass❑Fail ❑Pass ❑Fail ❑Pass❑Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass❑Fail ❑ Pass❑ Fail ❑Pass ❑Fail ❑Pass❑Fail <br /> Continuity Test Results ❑Pass ❑Fail ❑Pass❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.