Laserfiche WebLink
Foothill Landfill <br />Storm Water Pollution Prevention Plan <br /> <br /> <br /> <br />Page 74 <br />D. For influent not meeting MCLs, the facility will need to pretreat the infiltration <br />BMP or BMPs influent 18 to comply with the State Water Board’s Division of <br />Drinking Water MCLs referenced in General Permit Attachment I, Table A. <br />Figure 13.1.1.2 <br />x Table A: Applicable Constituents with Primary or Secondary MCLs <br />x Parameter <br />Category x MCL Criteria for Industrial Pollutant Pretreatment11 <br />x Primary MCLs: <br />x Primary MCLs: <br />Inorganics <br />x Primary MCLs: <br />Volatile Organic <br />Carbon (VOCs) <br />x Primary MCLs: <br />Synthetic Organic <br />Contaminants <br />(SOCs) <br />x Primary MCLs: <br />Disinfection <br />Byproducts <br />x see the “California Drinking Water-Related Laws” webpage <br />x (https://www.waterboards.ca.gov/drinking_water/certlic/drinkingwater/Lawbook.html) <br />x Secondary <br />MCLs: Total <br />Dissolved Solids <br />x Pollutants associated with industrial activities in the influent of the infiltration BMP(s) <br />shall not exceed 500 mg/L. <br />x Secondary <br />MCLs: Chloride <br />x Pollutants associated with industrial activities in the influent of the infiltration BMP(s) <br />shall not exceed 250 mg/L. <br />x Secondary <br />MCLs: Specific <br />Conductance <br />x Pollutants associated with industrial activities in the influent of the infiltration BMP(s) <br />shall not exceed 900 uS/cm. <br />x Secondary <br />MCLs for <br />Sulfate <br />x Pollutants associated with industrial activities in the influent of the infiltration BMP(s) <br />shall not exceed 250 mg/L. <br />x * If the applicable Regional Water Board’s Basin Plan contains different water quality objectives for <br />groundwater, the Basin Plan water quality objectives supersede as a pretreatment limit. <br />13.1.2 Onsite Compliance Option Implementation Schedule <br />13.1.2.1 Baseline Status <br />A facility with Baseline Status for all pollutants July 1, 2020, or on July 1 of the monitoring <br />and reporting year intending to implement the on-site compliance option will need to notify <br />the SWRCB or the RWQCB (Water Boards) via SMARTS no later than three (3) months prior <br />to the estimated date of the BMP or BMPs installation and operation or prior to obtaining <br />applicable local approvals for the BMP or BMPs, whichever comes first. The facility shall <br />submit the required implementation information and schedule in the facility’s SWPPP in <br />accordance with General Permit Attachment I, Section II.H.3. <br /> <br />18 see Attachment I, Section II.E.6 Footnote #’s 10