My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1744
>
2900 - Site Mitigation Program
>
PR0542458
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 12:59:37 PM
Creation date
1/26/2026 12:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542458
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024399
FACILITY_NAME
PARKWOODS CLEANERS
STREET_NUMBER
1744
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1744 W HAMMER LN STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP No. 240 <br /> Page 1 of 3 <br /> STANDARD OPERATING PROCEDURE NO. 240 <br /> DIRECT PUSH SOIL SAMPLING <br /> 1. INTRODUCTION <br /> 1.1 Overview <br /> This Standard Operating Procedure (SOP) was prepared to direct field personnel in the <br /> methods for conducting direct push technology (DPT) soil sampling activities. <br /> This SOP will be implemented in accordance with the following governing documents: <br /> • R1/FS Work Plan, which provides an overview of the site background and <br /> conceptual model and describes the overall investigative goals and scope of <br /> work for the RI/FS; <br /> • Health and Safety Plan (HASP), which identifies all physical, chemical, and <br /> biological hazards relevant to each field task and provides hazard mitigators to <br /> address these hazards; <br /> • Field Sampling Plan (FSP), which provides details for field sampling locations <br /> and procedures and which will be most frequently used by field staff on-site; <br /> and <br /> • Quality Assurance Project Plan (QAPP), which is written to establish protocols <br /> necessary to ensure that the data generated are of a quality sufficient to ensure <br /> that valid conclusions are drawn from the site characterization. <br /> 1.2 Objective <br /> The objective of DPT soil sampling is to collect subsurface soil samples at depth- <br /> discrete intervals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.