My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1744
>
2900 - Site Mitigation Program
>
PR0542458
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 12:59:37 PM
Creation date
1/26/2026 12:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542458
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024399
FACILITY_NAME
PARKWOODS CLEANERS
STREET_NUMBER
1744
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1744 W HAMMER LN STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP No. 240 <br /> Page 2 of 3 <br /> 2. EQUIPMENT <br /> A DPT rig will be used to conduct subsurface soil sampling activities. The DPT <br /> (Geoprobe®, PowerProbeTM or similar) device may be operated using a dual tube <br /> methodology which allows the collection of subsurface soil samples through an outer <br /> casing that is set to maintain the integrity of the boring. Using the DPT rig, borings are <br /> advanced by simultaneously driving an outer stainless steel casing and disposable inner <br /> Lexan tube into the ground. Upon reaching the desired penetration depth, the inner <br /> Lexan® tube is extracted to collect the discrete subsurface soil samples, leaving the <br /> outer casing in place. To sample the next interval of soil, a new length of Lexan® <br /> tubing is then inserted into the outer casing (already in the ground) attached to a length <br /> of drive pipe, and another length of outer casing is attached to the top of the outer <br /> casing that is already in the ground. The following materials should be available, as <br /> required, during the subsurface soil sampling: <br /> • equipment necessary for surface soil sampling(see SOP 200); <br /> • Personal Protective Equipment (PPE) and air monitoring equipment as required <br /> by the HASP; <br /> • DPT sampling equipment; <br /> • decontamination equipment per the QAPP and FSP; <br /> • measuring device; <br /> • photoionization detector(PID); <br /> • camera; and <br /> • field log book and forms as specified in other SOPS. <br /> 3. PROCEDURES <br /> The following procedures will be employed to collect subsurface soil samples: <br />
The URL can be used to link to this page
Your browser does not support the video tag.