My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 1:42:57 PM
Creation date
1/29/2026 3:40:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231021
PE
2361 - UST FACILITY
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
2908 W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elite IV Contractors <br /> 2535 Wigwam Dr. State Uc# 1001331 <br /> Stockton, Ca 95202 <br /> (209)461-6337 <br /> (209) 461-6342 Fax <br /> Site:Arco 2908 W. Ben Holt Dr. Stockton,Ca: <br /> Scope of work: RetroFit site for installation of Diesel Product on two of front Island Dispensers <br /> Phase l: Relocate Healy Tank and Vent Lines/Changeover 87 Tank to Diesel <br /> *Site will be down during relocation of Healy Tank due to open Vapor lines at location.* <br /> • Pre Test all secondary lines and vapor system for any leaks prior to construction. If any leaks <br /> are found and repairs are needed a change order will be required. Change order will be <br /> completed and billed separately.Once repairs are made we can continue with installation as <br /> quoted. <br /> • Drain down the existing 87 fuel tank to the lowest level possible by dispensing all fuel. Once we <br /> reach a low product max, existing fuel will be pumped into the existing 87 primary tank.Tank will <br /> be triple rinsed and water will be removed and placed into hazmat drums on site. Forced air will <br /> be blown through the tank to remove any existing vapor and to help dry the tank. Manifold <br /> vapor lines will be removed from the tank and re-connected to isolate diesel tank from existing <br /> 87&91 fuel tanks. Installation of diesel product float will be added to Tank Probe. Existing vapor <br /> poppet will be removed and capped. Fill container will be labeled and marked as a diesel product <br /> and necessary programming of TLS will be performed for the tank to accommodate diesel as <br /> required. <br /> • The Healy tank and vapor lines will be relocated to desired location and vapor lines will be <br /> re-plumbed and relocated to desired location.The 87&91 vent lines will be manifolded and the <br /> new diesel vent line will be isolated from the gasoline grades as required by AQMD. <br /> • The existing 87 tank then will be retrofitted and any necessary work for turbine motor and sump <br /> repairs will be made at this time to isolate the diesel tank to be ready for full operation and fuel <br /> delivery when required. <br /> • Post construction pressure decay testing and secondary testing will be performed to ensure all <br /> lines are tight.After passing results,trenches will be filled with asphalt or concrete as needed <br /> and construction will proceed to Phase 2. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.