My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
950
>
2900 - Site Mitigation Program
>
PR0547725
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 2:52:31 PM
Creation date
2/17/2026 11:14:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0547725
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027181
FACILITY_NAME
PROPOSED MONITORING WELL SITE
STREET_NUMBER
950
STREET_NAME
STEWART
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
2121007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
950 STEWART RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MANN STATION WELL DESTRUCTION <br /> 1.0 GENERAL <br /> The work to be completed as part of this project encompasses that which is necessary to <br /> destroy the abandoned (no longer in use) municipal well located at the San Jose Water's Mann <br /> Station (Figure 1). The purpose of the work is to properly seal the well thereby preventing <br /> vertical communication of water between the aquifers penetrated by the well and from the <br /> ground surface. <br /> 1.1 SCOPE OF WORK <br /> The well will be abandoned according to applicable standards and regulations of Valley Water <br /> and the State of California Department of Water Resources. The work generally includes: <br /> • Preparing well for video inspection <br /> • Performing video inspection <br /> • Procurement of well destruction permit from Valley Water <br /> • Preparation of site for operations <br /> • Destruction of well pedestal <br /> • Removal of casing to a depth of five feet below ground surface <br /> • Perforation of well casing (if necessary) <br /> • Placement of sealing material in well <br /> • Filling of excavation <br /> • Site Cleanup <br /> • Submission of Well Completion Report <br /> Table 1 includes all the currently available construction information for the Mann Well. <br /> Contractor will be responsible for obtaining missing information during the required field <br /> investigation of the well prior to abandonment. <br /> Table 1. Mann Well Construction Details <br /> DepthSanitary Gravel Well Casing <br /> Seal Packed ll -. <br /> Screened Intervals (ft) <br /> 307-313, 319-325, 331-337,343-385,421- <br /> 427,433 451-463,493-499, 553-565, <br /> 88 Yes 12 1,275 625-637, 661-673, 712-762,787-812,837- <br /> 862,886-911, 935-985, 1,007-1,022, <br /> 1,044-1,052, 1,077-1,083, 1,104-1,134, <br /> 1,152-1,160, 1,180-1,235, 1,247-1,259 <br />
The URL can be used to link to this page
Your browser does not support the video tag.