Laserfiche WebLink
SITE-SPECIFIC HEALTH AND SAFETY PLAN FOR PHASE II ENVIRONMENTAL SITE ASSESSMENT <br /> Site Control and Safety Procedures <br /> July 7, 2023 <br /> windows/doors/equipment storage areas, and maintaining control of tools and equipment when not in <br /> use. Security may be implemented in a variety of ways: <br /> • Orange construction fence (minimal security); <br /> • Chain link fencing; <br /> • Extra lighting; <br /> • Specialized locks; and/or <br /> • Contract security. <br /> 6.17 TRAFFIC GUIDANCE AND CONTROL <br /> Incidents on sites have shown the need for a site-specific Traffic Guidance and Control Plan. Where <br /> determined by risk analysis, the SHSO and project staff will develop a Traffic Guidance and Control Plan <br /> and disseminate this information to all site personnel. This plan will consider the amount of traffic at a site <br /> and provide for the safety of all workers. Equipment and resources to be considered as part of traffic <br /> guidance and control include: <br /> • Vehicle hazard lights (tail and headlights) <br /> • Delineators and orange construction fencing <br /> • Placement of vehicles as barriers between workers and traffic <br /> • Rotating amber hazard lights that can be placed on top of vehicles <br /> • Professionally trained flaggers <br /> Other considerations for the Traffic Guidance and Control Plan include: <br /> • Requiring personal vehicles (that aren't being used as barriers)to park as far away from potential <br /> traffic as possible. <br /> • Cordoning off as much space as is necessary to ensure our safety. This will be discussed with <br /> property owners and tenants, as it may mean closing down additional gasoline pumps, etc. <br /> • Identifying traffic flow routes and parking areas for heavy equipment(e.g., vacuum trucks, drill <br /> rigs, etc.) and establishing site speed limits. <br /> • Reviewing local regulations for: formally developed traffic guidance and control plans signed by <br /> licensed individuals, police details, flagmen, hours of activity, closure of streets, etc. <br /> 6.18 WORK HOURS <br /> Work on this project will be conducted during the hours of 6:00 AM to 6:00 PM, Monday through Friday. <br /> Stantec <br /> 6.6 <br />