My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3230
>
2900 - Site Mitigation Program
>
PR0548573
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 1:10:34 PM
Creation date
2/23/2026 1:07:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548573
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027771
FACILITY_NAME
7-ELEVENT STORE #41256
STREET_NUMBER
3230
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95206
APN
11708017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3230 N WEST LN STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE-SPECIFIC HEALTH AND SAFETY PLAN FOR PHASE II ENVIRONMENTAL SITE ASSESSMENT <br /> Site Control and Safety Procedures <br /> July 7, 2023 <br /> windows/doors/equipment storage areas, and maintaining control of tools and equipment when not in <br /> use. Security may be implemented in a variety of ways: <br /> • Orange construction fence (minimal security); <br /> • Chain link fencing; <br /> • Extra lighting; <br /> • Specialized locks; and/or <br /> • Contract security. <br /> 6.17 TRAFFIC GUIDANCE AND CONTROL <br /> Incidents on sites have shown the need for a site-specific Traffic Guidance and Control Plan. Where <br /> determined by risk analysis, the SHSO and project staff will develop a Traffic Guidance and Control Plan <br /> and disseminate this information to all site personnel. This plan will consider the amount of traffic at a site <br /> and provide for the safety of all workers. Equipment and resources to be considered as part of traffic <br /> guidance and control include: <br /> • Vehicle hazard lights (tail and headlights) <br /> • Delineators and orange construction fencing <br /> • Placement of vehicles as barriers between workers and traffic <br /> • Rotating amber hazard lights that can be placed on top of vehicles <br /> • Professionally trained flaggers <br /> Other considerations for the Traffic Guidance and Control Plan include: <br /> • Requiring personal vehicles (that aren't being used as barriers)to park as far away from potential <br /> traffic as possible. <br /> • Cordoning off as much space as is necessary to ensure our safety. This will be discussed with <br /> property owners and tenants, as it may mean closing down additional gasoline pumps, etc. <br /> • Identifying traffic flow routes and parking areas for heavy equipment(e.g., vacuum trucks, drill <br /> rigs, etc.) and establishing site speed limits. <br /> • Reviewing local regulations for: formally developed traffic guidance and control plans signed by <br /> licensed individuals, police details, flagmen, hours of activity, closure of streets, etc. <br /> 6.18 WORK HOURS <br /> Work on this project will be conducted during the hours of 6:00 AM to 6:00 PM, Monday through Friday. <br /> Stantec <br /> 6.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.