Laserfiche WebLink
wanow Bankers; I,m _ ShoAsaam,n! werk Gen. ,«Swath Repair Close; Skew,. Cressona <br /> BACKGROUND <br /> collected farm the 0-5, 5-102 and 27-30 feet Up intervals. Samples will be amdyeed for <br /> TPHg, TPHd, TOG, MTBG, VOCs, SVOCs, PAHs, PCBs, and Title 22 =lots.. <br /> Is yanks 11 through 14: 1'wa borings will be advanced in the vicinity of Tanks I I through 14 <br /> to a depth of at least 10 Feet hoes. Samples will he collected f mthe 0-5 and 5-10 feet lip <br /> intervals in each boring and will be analyzed for TPHS, TPHd, TOG, MIME, VOCA <br /> SVOCs, VAHs, PCAs, and Title 22 metals. <br /> Soil samples will be collected using a direct push technology (OPT) rig. All borings will be <br /> backfilled with hydrated hentonite when completed, and die surface paving will be restored. <br /> Investigation-derived waste including soil cuttings and decon aminatim water will be contained <br /> in drums and stored on-site pending characterization and off-site disposal. <br /> 3.3 TASK3 — REPORTING <br /> After analytical results are received anal reviewed, a Site Assessment Report will he prepared to <br /> decrement all field activities and analytical results. The repnd will include updated figures and <br /> data tables, and will be supported by appendices including photos, boring logs, field data sheets, <br /> and laboratory analytical reports. <br />