Laserfiche WebLink
' l � <br /> U,V4AR-667015 Crew Out e.,salJor she Eastern GM subarea nr M%2017 <br /> List of Figures <br /> Figure 1 . Location of I.LNL Site 300 and the General Services Arco Operable Unit. <br /> Figure 2. Site 300 map showing Operable Unit (OLE locations. <br /> Figure 3. Eastern General Services Area Subarea site map showing monitor, extraction, and <br /> water-supply wens, and treatment rocility. <br /> Figure 4. WE concentration trends in Eastern GSA wells. <br /> Figure 5. TCE concentrations in Eastern GSA well W-26R-0L <br /> Figure 6. Time-scrim imennessons iren contour maps for trichlore esnae (TC) in posted water <br /> in the Fastens General Services Area (for Ycam 19%, 2000, 2005, and 2012). <br /> Figure ). Eastern Genus] Services Area Subarea hand VOC isoconee tertian contour map and <br /> Individual VOC concentrations for the Qal-'I'also hydrostmtiVuldrie unit Go Semester <br /> 2012). <br /> List of Tables <br /> "fable 1 . Ground water cleanup standards for the General Services Am GSA) Operable Unit. <br /> Table 2. Status of institurionabland use controls for hue Eastern General Services Area Subarea <br /> of0porable Unit 1. <br /> Table 3. oisnrical and 2012 maximum concentrations of contaminants Of concern m Easnm <br /> GSA ground water compared m GSA Wound water cleanup standards. <br /> Table 4. 'ICE concentrations in Eastern GSA wells in January 2012. <br /> Appendices <br /> Appendix A. 'rechnical Memorandum fur Charmuerizahinn of Subsurface Soil in the Eastern <br /> General Services Area Debris Ended Trenches, Lawremx Livermore National <br /> Laboratory Site 300 <br /> Appendix R. Reference list of Doreadents Relevant to the Eastern GSA Remediation process <br /> Appendix C. WE Responses to Regulatory Comments on the Draft and Draft Final Emorn <br /> GSA Submrea Close Out Report <br />