Laserfiche WebLink
Appendix 8.3 <br /> Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Containment Sump and UDC Test Continuation Page <br /> FERS ID Facility Name Test Date <br /> 180733 Arco 7147 4/14/2026 <br /> 8. CONTAINMENT SUMP AND UDC TEST (continued) <br /> Sump1UDC ID 9110 <br /> Sump Manufacturer Bravo <br /> Sump Depth (inches) NA <br /> Sump Bottom to Top of NA <br /> Highest Pipe Penetration <br /> inches <br /> Test Start Time 11:29AM <br /> Initial Reading 1,3883" <br /> Test End Time 11:44AM <br /> Final Reading 1.3881" <br /> Change in Reading 0.0002" <br /> Pass/Fail Criteria 0.002" <br /> Tightness Test Results a Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Continuity Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump1UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> inches <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Continuity Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail j ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. <br />