Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. CONTAINMENT SUMP AND UDC TEST <br /> Test Method ❑eveioped by ❑ Manufacturer a Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum e Hydrostatic <br /> Test Equipment Used:lncon TS-STS <br /> S Check this box if Appendix 8.3 continuation page is attached. <br /> Sump1UDC ID 87 STP 91 STP DSL STP 112 <br /> Sump Manufacturer Containment Solutions Containment Solutions Containment Solutions Bravo <br /> Sump Depth (inches) NA NA NA NA <br /> Sump Bottom to Top of NA NA NA NA <br /> Highest Pipe Penetration <br /> inches <br /> Test Start Time 9:05AM 9:05AM 9:33AM 10:09AM <br /> Initial Reading 1.4105" 1.1293" 1.1242" 1.2068" <br /> Test End Time 9:20AM 9:20AM 9:48AM 10:24AM <br /> Final Reading 1.4104" 1.1292" 1.1240" 1.2067" <br /> Change in Reading 0.0001" 0.0001" 0.0002" 0,0001" <br /> Pass/Fail Criteria +1- 0.002" +1- 0.002" +l- 0.002" +1- 0.002" <br /> Tightness Test Results S Pass ❑ Fail a Pass ❑ Fail S Pass ❑ Fail a Pass ❑ Fail <br /> Continuity Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 3/4 5 6 718 <br /> Sump Manufacturer Bravo Bravo Brava Bravo <br /> Sump Depth (inches) NA NA NA NA <br /> Sump Bottom to Top of NA NA NA NA <br /> Highest Pipe Penetration <br /> Inches <br /> Test Start Time 10:09AM 10:39AM 10:39AM 11:29AM <br /> Initial Reading 1.4917" 1.3743" 1.3495" 1.4035" <br /> Test End Time 10:24AM 10:54AM 10:54AM 11:44AM <br /> Final Reading 1.4915" 1.3740" 1.3495" 1.4033" <br /> Change in Reading 0.0002" 0.0003" 0.00" 0.0002" <br /> Pass/Fail Criteria +l- 0.002" +/- 0.002" +/- 0.002" +/- 0.002" <br /> Tightness Test Results a Pass ❑ Fail a Pass ❑ Fail a Pass ❑ Fail © Pass ❑ Fail <br /> Continuity Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. Page 3 of 4 <br />