My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2026 3:18:05 PM
Creation date
2/27/2026 3:52:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231175
PE
2361 - UST FACILITY
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1206 E MARCH LN STOCKTON 95210
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Deport Farm <br /> 6_ TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed Py ❑ Manufacturer N Industry Standard Q Professional Engineer <br /> Test Tyee 0 Pressure d Vacuum ❑ H drostatir, <br /> Test Equipment Used-.Vacuurn Gauge <br /> ❑ Check this box if Appendix 8.1 continuation page is attached, <br /> Tank 1D 87 91 DSL <br /> Tank Manufacturer Owens Corning Owens Corning Owens Corning <br /> Test Stark Time 8:42AM 8:56AM 9:17A <br /> [nitial Reading -10psi -10psi -1I?psi <br /> Test End Time 9:4 AM 9:55AM 1 O:17AM — - - <br /> Final Reading psi -90ps1 -10 si <br /> Change in Reading Opsi Opsl Opsi <br /> Pass/Fail Criteria +/- Opsi +{- Opsi +/- ppsi <br /> Tightness Test Results 9 Pass ❑ Fail R Pass ❑ Fail' IN Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Methad Developed b V ❑ Man4,factnrer a Industry Standard ❑ Professional Engineer <br /> Test -Type R Pressure I7 Vacuum ❑ Hydrostatic <br /> Test Equipment Used:Pressure Gauge <br /> 0 Check this box if Appendix 8.2 continuation page is attached, <br /> Pipe Run ID 87 91 DSO. <br /> Pipe Manufacturer smiih Smith Smith <br /> Test Start Time :1 OAM :19 M 9:31 AM <br /> Initial Reading 5psi 5psi 5psi <br /> Test End Time 1O:1DAM 10;19AM 10:31AM <br /> Final Reading 5psi 5psi 5psi <br /> Change in Reading Opsi Opsi Opsi <br /> Pass/Fail Criteria +{- Opsi +I- Opsi +!_ opsl <br /> TI htness Test Results a Pass 0 Pail 9 Pass ❑ Fail d Pass ❑ Fail ❑ Pass ❑ Fail <br /> Continuity Test Results IR Pass 0 Fail N Pass 0 Fail d Pass ❑ Fail ❑ Pass 1l Fail <br /> Pipe Run ED <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial' Beading <br /> Test lend Time <br /> Final Reading <br /> Change in Reading <br /> PassfFail Criteria <br /> Tightness Test Results 0 Pass Q Fail I Pass ❑ Fail 11 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Continuity Test Results 0 Pass ❑ Fail ❑ Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass 0 Fail <br /> Describe in Section 9 all tests marked "Fail" and any repairs made dwingr the test. Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.