My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 1:48:48 PM
Creation date
3/2/2026 2:53:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231111
PE
2361 - UST FACILITY
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14121403
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
2285 E FREMONT ST STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: NIA <br /> ❑ Check this box if Appendix 8.1 continuation page is attached. <br /> Tank ID <br /> Tank Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading I <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass❑ Fail ❑Pass❑ Fail ❑Pass❑ Fail ❑ Pass❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: N/A <br /> ❑ Check this box if Appendix 8.2 continuation page is attached. <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass❑Fail ❑Pass❑ Fail ❑Pass❑Fail ❑Pass❑ Fail <br /> Continuity Test Results ❑Pass ❑Fail ❑Pass❑Fail ❑Pass ❑Fail ❑Pass❑Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass❑Fail ❑ Pass❑ Fail ❑Pass ❑Fail ❑Pass❑Fail <br /> Continuity Test Results ❑Pass ❑Fail ❑Pass❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.