My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
2900 - Site Mitigation Program
>
PR0541576
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 4:01:54 PM
Creation date
3/3/2026 3:58:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541576
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0023836
FACILITY_NAME
BOULEVARD AUTOMOTIVE SERVICE
STREET_NUMBER
2151
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12808030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2151 COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br /> The scope of work of this investigation will include the following activities: <br /> • Obtain a well installation permit from the San Joaquin County Department of <br /> Environmental Heath(SJCDEH); <br /> • Mark the proposed boring and well location and obtain an Underground Service Alert <br /> (USA)number; <br /> • Implement a Site-specific Health and Safety Plan; <br /> • Advance soil borings CPT-IA and CPT-113 to depths of 80 feet bgs using a CPT/direct <br /> push drill rig to profile soil lithology and collect soil samples at 5-foot intervals from 65 to <br /> 80 feet bgs; <br /> • Straight drill soil boring B SW-1 to a depth of 80 feet bgs using a hollow stem auger(HSA) <br /> drill rig and construct a biosparge well B SW-1 in the borehole; <br /> • Submit soil samples to a laboratory for analysis; <br /> • Develop newly installed biosparge well BSW-1; <br /> • Survey biosparge well BSW-1 for location and elevation; <br /> • Profile, transport, and recycle the investigation soil and groundwater derived waste and; <br /> • Prepare a report documenting the investigation. <br /> FIELD ACTIVITIES <br /> Activities related to this subsurface investigation will be conducted under the direction of a <br /> California Certified Engineering Geologist and a California Professional Geologist in accordance <br /> with the field procedures presented in Appendix B.A Site-specific Health and Safety Plan to guide <br /> field personnel during the conduct of field work is included in Appendix C. <br /> PRE-FIELD WORK <br /> FREY will obtain a well installation permit from the SJCDEH. FREY will mark the proposed <br /> biosparge well location with white paint and notify USA a minimum of 48 hours prior to the <br /> conduct of field work. In addition, FREY will notify the SJCDEH and all other interested parties <br /> prior to the conduct of field work. <br /> CPT BORING ADVANCEMENT <br /> CPT borings CPT-IA and CPT-113 will be completed with a 30-ton CPT equipped with 2-inch <br /> diameter drive rods at the locations shown on Figures 3 and 3A. The borings will be manually <br /> excavated to approximately 4 feet bgs in order to avoid any subsurface obstructions and then <br /> advanced to final depths of 80 feet bgs. CPT boring CPT-IA will be advanced to measure rod tip <br /> resistance, rod sidewall friction, the ratio of tip resistance and sidewall friction and hydraulic soil <br /> pore pressures to evaluate soil types and zones of higher groundwater saturation. CPT/direct push <br /> boring CPT-1B will be advanced adjacent to CPT boring CPT-IA to collect soil samples at 5-foot <br /> intervals from 65 feet bgs to the bottom of the boring. <br /> FREY Environmental, Inc. 3 Project No. 1175-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.