My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BETHANY
>
0
>
2900 - Site Mitigation Program
>
PR0549018
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 1:08:50 PM
Creation date
3/5/2026 1:01:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0549018
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0028127
FACILITY_NAME
MW-201
STREET_NUMBER
0
STREET_NAME
BETHANY
STREET_TYPE
RD
City
TRACY
Zip
95304
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
0 BETHANY RD TRACY 95304
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Monitoring Well Construction Workplan <br /> February 2024 <br /> Drilling, Well Construction, and Monitoring <br /> The following describes the methods and approaches to the monitoring well drilling, <br /> construction, development, surveying, collecting baseline water quality, and documenting these <br /> activities. <br /> Permitting <br /> Eaton will obtain monitoring well drilling permits from the San Joaquin County Environmental <br /> Health Department (SJCEHD)prior to the start of work. <br /> Drilling and Logging <br /> All drilling activities will be overseen by a DWR geologist. Drilling and well construction <br /> activities for the new groundwater monitoring wells include the following: <br /> • All drill equipment will be high-pressure washed prior to arriving on site. <br /> • Drill an 8-inch diameter exploration to a maximum depth of 850 feet bgs using the mud- <br /> rotary drilling method. <br /> • Ream the borehole to a 12-inch-diameter boring, at the location to accommodate 2 well <br /> casings and to 16-inch-diameter boring to accommodate 2 or more well casings. The <br /> deepest well casing will be set into an 8-inch diameter boring. <br /> • Collect drilling cuttings every 10 feet or change in materials, classify materials according <br /> to the Unified Soil Classification System, and prepare a lithologic log during drilling. The <br /> materials will be classified by a Geologist or Geotechnical Engineer and reviewed by a <br /> licensed California Professional Geologist. <br /> • Perform geophysical logging suite including (electric, spontaneous potential, and gamma <br /> ray). <br /> Drill cuttings will be stockpiled onsite in a contained depression with all internal drainage. No <br /> contaminated soils are expected to be encountered. Drilling fluids, thin-down water, <br /> development and purge water will be placed into the depression and will either evaporate or <br /> percolate into the soils. <br /> Monitoring Well Construction <br /> Figure 9 and 10 provides the typical well construction details. Final well construction details <br /> will be designed after the geophysical logging suite and lithologic logs are reviewed. The screen <br /> intervals may range from 10 to 40 feet long, depending upon the thickness of the aquifer,but will <br /> at no time will cross multiple aquifers. A copy of the final design will be provided to SJEHD <br /> prior to construction for approval as long as the review and approval. A 24-hour notice will be <br /> GEI Consultants, Inc. 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.