My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2026 3:05:28 PM
Creation date
3/5/2026 3:52:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231176
PE
2361 - UST FACILITY
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2701 W MARCH LN STOCKTON 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. CONTAINMENT SUMP AND UDC TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: incon Ts sTs <br /> ❑ Check this box if Appendix 8.3 continuation page is attached. <br /> Sump/UDC ID UDC 3/4 <br /> Sump Manufacturer Bravo <br /> Sump Depth (inches) 12" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration Bottom <br /> inches <br /> Test Start Time 11:24 am <br /> Initial Reading 1.1838 <br /> Test End Time 11:39 am <br /> Final Reading 1.1837 <br /> Change in Reading 0.0001 <br /> Pass/Fail Criteria 0.0020 <br /> Tightness Test Results ❑✓ Pass❑Fail ❑ Pass❑ Fail ❑ Pass❑ Fail ❑ Pass❑Fail <br /> Continuity Test Results ❑ Pass❑Fail ❑ Pass❑ Fail ❑ Pass❑ Fail ❑ Pass❑Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> inches <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass❑Fail ❑ Pass❑Fail ❑ Pass❑Fail ❑ Pass❑Fail <br /> Continuity Test Results ❑ Pass❑Fail ❑ Pass❑Fail ❑ Pass❑ Fail ❑ Pass❑Fail <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.