Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> 91 Secondary piping, sealed hubs in UDC 1/2, 7/8 also sealed 5/6 and 11/12, retested and passed. <br /> UDC 3/4, replaced conduit boot. Cleaned, sanded and glued on B2000 kit on the conduits. <br /> Retested and passed. <br /> Continuity tested on product piping at UDC, passed. <br /> Unable to perform continuity to UDC due to component is single walled. <br /> No inspector present. <br /> Describe in Section 9 all tests marked "Fail"and any repairs made during the test. Page 4 of 4 <br />