My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2026 2:02:15 PM
Creation date
3/9/2026 9:46:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231141
PE
2361 - UST FACILITY
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1810 E HAZELTON AVE STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM TAIT & ASSOCIATES - Sacy- to FAX NO. : 9166352606 eb. 09 1999 07:30PM P2 <br /> February 9. 1999 <br /> Via: Hand-Delivery <br /> Jim Cornell <br /> Stockton Service Station Equipment Company, Inc. <br /> SUS N. Union Street <br /> Stockton, CA 95205 <br /> RE: San Joaquin County Corporation Yard <br /> Primary Underground Piping <br /> TATT Job SP3952 <br /> Dear Mr. Cornell- <br /> As a result of discussions between the Public Works Department and the Health Department <br /> regarding the fiberglass piping installation, it was determined that the project will only t+e <br /> allowed to continue once one of two actions are taken to rectify the concerns of the above <br /> Departments due to the appearance of the installation. <br /> The quantity of glue at the joints concerns the departments and does not appear to be in <br /> compliance with the manufacturer's installation instructions. The two actions that will satisfy <br /> the County inspectors are as follows: <br /> tion#1: Perform a hydrostatic cyclic test as recommended by A.Q. Smith in <br /> Manual /fB2150, dated July 15, 1996. During discussions with the Health Department <br /> the following issues were clarified: <br /> a) The impact valves at dispenser sumps are to be removed and the flex <br /> connector capped prior to testing system. <br /> b) Test to be run to 175 psi and in conjunction with A_4. Smith Test <br /> Procedure (Section 1.7.2 of above-referenced manual). <br /> c) Test shall be run on 1) Gasoline Primary, 2) Diesel Primary, and 3) <br /> Diesel Satellite product lines. The cyclic pressure test is not required on the <br /> vent and vapor recovery lines. The pressure is to be kept on each individual <br /> system without pressure fluctuation for one hour prior to system obtaining <br /> approval, <br /> d) Once cyclic pressure is complete and systems are deemed tight, the <br /> impact valves shall be reinstalled, and the air pressure test per the project- <br /> approved plans would need to be completed prior to final primary system <br /> approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.