Laserfiche WebLink
FROM TAIT & ASSOCIATES - Sacy- to FAX NO. : 9166352606 eb. 09 1999 07:30PM P2 <br /> February 9. 1999 <br /> Via: Hand-Delivery <br /> Jim Cornell <br /> Stockton Service Station Equipment Company, Inc. <br /> SUS N. Union Street <br /> Stockton, CA 95205 <br /> RE: San Joaquin County Corporation Yard <br /> Primary Underground Piping <br /> TATT Job SP3952 <br /> Dear Mr. Cornell- <br /> As a result of discussions between the Public Works Department and the Health Department <br /> regarding the fiberglass piping installation, it was determined that the project will only t+e <br /> allowed to continue once one of two actions are taken to rectify the concerns of the above <br /> Departments due to the appearance of the installation. <br /> The quantity of glue at the joints concerns the departments and does not appear to be in <br /> compliance with the manufacturer's installation instructions. The two actions that will satisfy <br /> the County inspectors are as follows: <br /> tion#1: Perform a hydrostatic cyclic test as recommended by A.Q. Smith in <br /> Manual /fB2150, dated July 15, 1996. During discussions with the Health Department <br /> the following issues were clarified: <br /> a) The impact valves at dispenser sumps are to be removed and the flex <br /> connector capped prior to testing system. <br /> b) Test to be run to 175 psi and in conjunction with A_4. Smith Test <br /> Procedure (Section 1.7.2 of above-referenced manual). <br /> c) Test shall be run on 1) Gasoline Primary, 2) Diesel Primary, and 3) <br /> Diesel Satellite product lines. The cyclic pressure test is not required on the <br /> vent and vapor recovery lines. The pressure is to be kept on each individual <br /> system without pressure fluctuation for one hour prior to system obtaining <br /> approval, <br /> d) Once cyclic pressure is complete and systems are deemed tight, the <br /> impact valves shall be reinstalled, and the air pressure test per the project- <br /> approved plans would need to be completed prior to final primary system <br /> approval. <br />