My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2026 2:02:15 PM
Creation date
3/9/2026 9:46:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231141
PE
2361 - UST FACILITY
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1810 E HAZELTON AVE STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM: TFG I T a ASSOCIATES - Sacra to FRK NO, : 9166352606 �eb. 09 1999 0 i:3©AN P3 <br /> Mr Jim Cornell <br /> February 8, 1999 <br /> Page 2 of 2 <br /> tion#Z: Replace ALL existing fittings with new fittings following the <br /> manufacturer's installation manual #H1260, dated My 15, 1996. Retest system per <br /> project-approved plans. <br /> Once eithci- of these two options is chosen by Stocktoa Service Station Equipment Company. <br /> Inc., it must be coordinated with the Health Department to allow this project to contirue. <br /> Please review the options and contact myself, lrarl Gilford or At $levins to coordinate a <br /> meeting with.the Health Department to inform them of your company's decision. <br /> Once the primary piping is finally approved by the Health Department. the secondary piping <br /> installation may continue. Testing and inspection of the future installations will need to be <br /> completed per the project-approved plans. <br /> Respectfully, <br /> TAIT AND ASSOCIATES, INC. <br /> Stanley P. Iverson PE <br /> Vice -President <br /> cc: Earl Gilford, Motor Pool <br /> Al Slevins, Public Works Department <br /> Doug Wilson, Health Department <br /> Il.M17M&1c.lac <br />
The URL can be used to link to this page
Your browser does not support the video tag.