|
IA
<br />removed
<br />added at ordering.
<br />INTERIOR
<br />ARCHITECTS
<br />A1 10 — Architectural Floor Plan
<br />Location of the interior roof ladder is revised.
<br />Mopus shelf length is revised.
<br />Interior Architech, Inc , a California corporation in AK, AL, AZ, CA, DE, HI, IN, <S, KY, MA. MN, MO, MT, NE, NH, OK, SC, SD, TN, TX, UT, VA, VT, WA, Wl, WV, WY / Interior Architech, P C , a Now York professional services corporation in Al, AR, DC,
<br />GA, ID, IA, MF, MD, MS, NM, NV, NY, NC. ND, OH, OR, PA / Interior Architects, P.C dba Intenor Architech, professional corporation In Rl / Interior Architects New Jersey PC, a New Jersey professional corporation in NJ and CT / Interior Architects, P.C.
<br />dba IA Interior Architects in |l / Interior Architech, P.C., license #AA?600l 062 in FL / Interior Architects, P.C dba Interior Architects, a professional corporation in LA / Interior Architech, Inc., a Colorado corporation In CO. Ml / IA Interior Architects Inc.,
<br />'Holder of Certificate of Practice, Architectural Institute of British Columbia, Alberta Association o: Architects and Ontario Association of Architects' in British Columbia. Alberta, and Ontario, Canada / Interior Archilech Inc. - UK Branch (t/a IA UK} / One IA
<br />Design UK Limited / One |A Design Limited
<br />\^A131 - Equipment Schedule
<br />Kitchen equipment ice maker manufacturer are changed.
<br />Undercounter beverage station shelf is changed.
<br />Note to add blocking is added to the prep sink.
<br />DML tortilla right is added to the description.
<br />Equipment at Plancha are revised.
<br />Al 1 1 - Architectural Floor Plan - Dimensions
<br />Back of house dimensions are revised.
<br />Dimensions are revised at Mopus shelf.
<br />V Al 20 - Finish Plan
<br />Porcelain tile flooring (F6) and rubber base (B3) are
<br />from the finish schedule.
<br />Resinous flooring (F5) is added on the finish schedule.
<br />Floor finish and base are revised on the room finish schedule.
<br />Floor finish at front of the house is changed to polished concrete
<br />(Fl).
<br />Floor finish at restrooms and utensil is revised to resinous floor
<br />(F5).
<br />Floor transition details are
<br />Al 30 - Architectural Floor Plan
<br />Location of the interior roof ladder is revised.
<br />Mopus shelf length is revised.
<br />Bypass distribution panel note is deleted at Office.
<br />Kitchen equipment tags are revised at Plancha.
<br />Kitchen equipment tags are revised at ice machine and ice
<br />makers.
<br />CO2 remote filler location is moved.
<br />Al 01 - Slab Plan
<br />Note to x-ray existing concrete is removed.
<br />Dimension to the mop sink is added.
<br />Dimensions of floor penetration at prep area are revised.
|