My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2026 1:33:43 PM
Creation date
3/26/2026 9:48:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231130
PE
2361 - UST FACILITY
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #132
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07118020
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3555 W HAMMER LN STOCKTON 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 5. MONITORING SYSTEM AND PROGRAMMING <br /> A separate Release Detection Equipment Testing Report Form must be prepared for each <br /> monitoring system. <br /> Manufacturer of Monitoring Model of Monitoring System Software Version Installed <br /> System Control Panel Control Panel <br /> Veeder Root TLS-350 336.01 <br /> Attach the post-testing reports if the monitoring system is capable of generating Yes No NA <br /> either. ❑✓ Monitoring System Set-up Report ❑✓ Alarm History Report <br /> Is all release detection equipment that was tested operational per manufacturer's ❑ <br /> specifications? <br /> Is the secondary containment free of damage, debris, or liquid? ❑✓ ❑ <br /> Are the release detection audible and visual alarms operational? ✓❑ ❑ <br /> Have all sensors been: 1) visually inspected for wiring kinks, breaks and residual ✓❑ ❑ ❑ <br /> buildup on floats; and 2) tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity? ✓❑ ❑ ❑ <br /> Was the monitoring system set-up reviewed, and proper settings confirmed? ❑✓ ❑ ❑ <br /> Was the monitoring system's backup battery visually inspected, functionally tested, ✓❑ ❑ ❑ <br /> and confirmed operational? <br /> Was it confirmed that the flow of hazardous substance stops at the dispenser if a ❑ ❑ <br /> release is detected in the under-dispenser containment? <br /> Does the pressure supply pump automatically shut down if the piping secondary ❑ ❑ <br /> containment monitoring system fails to operate or is disconnected? <br /> Does the pressure supply pump automatically shut down if the piping secondary <br /> containment monitoring system detects a release? Which sensors initiate positive ❑✓ ❑ ❑ <br /> shut down? (Check all that apply) ❑✓ Containment Sump ❑✓ UDC <br /> If release detection alarms are relayed to a remote monitoring center, is all ❑ ❑ ❑✓ <br /> communication equipment operational? <br /> If there is any buried single-wall suction hazardous substance piping, was it <br /> confirmed using the inspection method approved by the Unified Program Agency, ❑ ❑ ❑✓ <br /> that the pipe contents drain back into the UST if the suction is released? <br /> Describe all answers marked "No"or "Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.