Laserfiche WebLink
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 6. SENSOR TEST RESULTS <br /> ❑ Check this box if Appendix 5.1 continuation page is attached. <br /> List only sensors tested. List "Sensor ID"as labeled in system programming. For VPH monitoring, <br /> continuity must be confirmed between the most distant points in the interstitial space to the extent <br /> practical as approved by the Unified Program Agency and the sensor that monitors the zone. <br /> Sensor Sensor Function Continuity <br /> ID Model Component(s) Monitored pass Fail Pass Fail NA <br /> L1 794380-208 87 South STP Sump ❑✓ ❑ ❑ ❑ ❑✓ <br /> L2 794380-208 87 North STP Sump ❑✓ ❑ ❑ ❑ ❑✓ <br /> L3 794380-208 Premium STP Sump ✓❑ ❑ ❑ ❑ ❑✓ <br /> L4 794380-407 87 South Annular ❑✓ ❑ ❑ ❑ ❑✓ <br /> L5 794380-409 87 North Annular ❑✓ ❑ ❑ ❑ ❑✓ <br /> L6 794380-407 Premium Annular ❑✓ ❑ ❑ ❑ ❑✓ <br /> L7 794380-208 Dispenser 1-2 ✓❑ ❑ ❑ ❑ ❑✓ <br /> L8 794380-208 Dispenser 3-4 ❑✓ ❑ ❑ ❑ ❑✓ <br /> L9 794380-208 Dispenser 5-6 ✓❑ ❑ ❑ ❑ ❑✓ <br /> L10 794380-208 Dispenser 7-8 ❑✓ ❑ ❑ ❑ ❑✓ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> Describe all answers marked "No"or "Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 3 of 6 <br />