Laserfiche WebLink
made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br />Tank ID 1-87-Master 2-87-Siphon 3-Super 91 <br />Tank Manufacturer K&T Steel K&T Steel K&T Steel <br />Tank Capacity 12K 12K 12K <br />Test Start Time 8:45 9:20 9:25 <br />Initial Reading -10" Hg. -10" Hg. -10" Hg. <br />Test End Time 9:45 10:20 10:25 <br />Final Reading -10" Hg. -10" Hg. -10" Hg. <br />Change in Reading 0" Hg. 0" Hg. 0" Hg. <br />Pass/Fail Criteria No Loss No Loss No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Pipe Run ID 1-87-Master 2-87-Slave 3-87-Siphon 4-91 <br />Pipe Manufacturer Smith Smith Smith Smith <br />Test Start Time 8:30 8:35 8:40 8:45 <br />Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br />Test End Time 9:30 9:35 9:40 9:45 <br />Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br />Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br />Pass/Fail Criteria No Loss No Loss No Loss No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br />6. TANK SECONDARY CONTAINMENT TEST <br />7. PIPE SECONDARY CONTAINMENT TEST