Laserfiche WebLink
made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID 1-87-Mast-PS 2-87-Siph-PS 3-91-PS <br />Sump Manufacturer Western FG Western FG Western FG <br />Sump Depth (inches) 58" 58" 58" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />12" 12" 12" <br />Test Start Time 8:42 8:47 8:52 <br />Initial Reading .001 .001 .001 <br />Test End Time 9:12 9:17 9:22 <br />Final Reading .001 .001 .001 <br />Change in Reading 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br /> <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST