My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2026 9:37:58 AM
Creation date
4/16/2026 8:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0543720
PE
2231 - HAZARDOUS WASTE PBR FACILITY
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1325 1 EL PINAL DR STOCKTON 95205
Suite #
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of violations that have not been addressed for METAL <br /> FINISHING SOLUTIONS - STOCKTON CA as of April 06, 2026. <br /> Open violations from November 04, 2025 inspection <br /> OBSERVATION 1:The hazardous waste treatment system written inspection records using the Hazardous Waste <br /> Tank System Daily Inspection Log for the tanks in the wastewater treatment area do not meet the requirements of this <br /> section. <br /> -On February 1 st and 2nd of 2024 the question "Is secondary containment free of waste and liquid?" is marked"No". <br /> No comments regarding the source of the liquid or any follow-up action were documented. <br /> -The log for May 8th through May 10th, 2024, are marked "NA". However, the maintenance checklists were completed <br /> for these days. No explanation for why the tank system inspections were not completed on these days was <br /> documented. <br /> -The April 2025 log includes a note that reads"pipe broke waiting on parts". Liquid in the secondary containment, <br /> system corrosion/damage, compromised condition of pipes,valves or pumps were noted on the same days. No follow <br /> up corrective action was documented. <br /> -The July 2025 log is marked"No"for the question"Is secondary containment free of waste and liquid?"on the 30th <br /> and 31 st. No comments regarding the source of the liquid or any follow up action was documented. <br /> -The October 2025 log includes a comment"10/1/25 lift station pump broke flooding secondary containment by the <br /> line". System corrosion/damage and compromised condition of pipes,valves or pumps for the 1 st through the 3rd was <br /> noted in the log. Liquid in the secondary containment was noted from the 1 st through the 16th. No explanation of how <br /> liquid continued to enter the secondary containment after the other compliance issues were resolved was <br /> documented. No follow up corrective action was documented for any of the issues noted in the log. <br /> (Continued in overall inspection comments section at the bottom of the report) <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.