Laserfiche WebLink
The following is an itemized list of violations that have not been addressed for METAL <br />FINISHING SOLUTIONS - STOCKTON CA as of April 06, 2026. <br />Open violations from November 04, 2025 inspection <br />OBSERVATION: All documents for operating a fixed treatment unit (FTU) were not maintained onsite. <br />REGULATION GUIDANCE: (8) Maintain the documents specified below at the facility where the FTU is operating. The <br />owner or operator shall make these documents available upon demand at the facility to the San Joaquin County <br />Environmental Health Department (EHD). The documents include: <br />(A) A waste analysis plan for the treatment operation as specified in section 66265.13(b) <br />(B) A written inspection schedule as specified in section 66265.15(b); <br />(C) Training documents as specified in section 66265.16(d)(3); <br />(D) A contingency plan which contains the information specified in section 66265.52; <br />(E) A copy of the most recent notification submitted as required by sections 67450.2(b)(2), 67450.3(c)(1) and <br />67450.3(c)(2) and a copy of the most recent acknowledgement received from the Department, CUPA or authorized <br />agency pursuant to sections 67450.2(b)(2) and 67450.3(d); <br />(F) A copy of any local Air District permit and other permits required for the operation of the FTU ; <br />(G) A copy of the closure plan required by subsection (c)(11)(B) of this section; <br />(H) A copy of documents related to the environmental investigation and any cleanup , abatement or other necessary <br />remedial action taken pursuant to section 67450.7; <br />(I) Documentation of any convictions, judgments, settlements, or orders resulting from any action by any local, State, <br />or federal environmental or public health enforcement agency concerning the operation of the facility within the last <br />three years. <br />CORRECTIVE ACTIONS: Generate and provide a copy of the required documents to the EHD. Provide a corrective <br />action statement and supporting documentation to the EHD within 30 days. <br /> <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Page 2 of 7