My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2026 9:37:58 AM
Creation date
4/16/2026 8:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0543720
PE
2231 - HAZARDOUS WASTE PBR FACILITY
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1325 1 EL PINAL DR STOCKTON 95205
Suite #
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of violations that have not been addressed for METAL <br /> FINISHING SOLUTIONS - STOCKTON CA as of April 06, 2026. <br /> Open violations from November 04, 2025 inspection <br /> OBSERVATION:All documents for operating a fixed treatment unit(FTU)were not maintained onsite. <br /> REGULATION GUIDANCE: (8)Maintain the documents specified below at the facility where the FTU is operating.The <br /> owner or operator shall make these documents available upon demand at the facility to the San Joaquin County <br /> Environmental Health Department(EHD). The documents include: <br /> (A)A waste analysis plan for the treatment operation as specified in section 66265.13(b) <br /> (B)A written inspection schedule as specified in section 66265.15(b); <br /> (C)Training documents as specified in section 66265.16(d)(3); <br /> (D)A contingency plan which contains the information specified in section 66265.52; <br /> (E)A copy of the most recent notification submitted as required by sections 67450.2(b)(2), 67450.3(c)(1)and <br /> 67450.3(c)(2)and a copy of the most recent acknowledgement received from the Department, CUPA or authorized <br /> agency pursuant to sections 67450.2(b)(2)and 67450.3(d); <br /> (F)A copy of any local Air District permit and other permits required for the operation of the FTU; <br /> (G)A copy of the closure plan required by subsection (c)(1 1)(B)of this section; <br /> (H)A copy of documents related to the environmental investigation and any cleanup, abatement or other necessary <br /> remedial action taken pursuant to section 67450.7; <br /> (1) Documentation of any convictions,judgments, settlements, or orders resulting from any action by any local, State, <br /> or federal environmental or public health enforcement agency concerning the operation of the facility within the last <br /> three years. <br /> CORRECTIVE ACTIONS: Generate and provide a copy of the required documents to the EHD. Provide a corrective <br /> action statement and supporting documentation to the EHD within 30 days. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.