My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2026 9:37:58 AM
Creation date
4/16/2026 8:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0543720
PE
2231 - HAZARDOUS WASTE PBR FACILITY
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1325 1 EL PINAL DR STOCKTON 95205
Suite #
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of violations that have not been addressed for METAL <br /> FINISHING SOLUTIONS - STOCKTON CA as of April 06, 2026. <br /> Open violations from November 04, 2025 inspection <br /> OBSERVATION: The hazardous waste treatment tank system secondary containment system is not adequate. During <br /> the inspection,the secondary containment for the wastewater treatment area was observed with layers of crystalized <br /> and clumped white material, sludge, and wet puddled staining. Multiple sections of ground level piping for the system <br /> were observed with a crystalized and caked white substance.Areas of the floor adjacent to and surrounding the <br /> bottom rims of multiple tanks were observed to have crystalized and caked layers of a white and yellow substance. <br /> The interior walls and top of the secondary containment berm and several components of the sides of components of <br /> the treatment system were observed with white staining.The acid drum, caustic drum and mix tanks were observed <br /> with dark sludge around their bases and dark splash marks on their walls. Per Allan Rodriguez,Vice President, the <br /> facility is in the process of installing epoxy throughout the secondary containment area and they scrape off a small <br /> area of debris at a time and dispose of it as hazardous waste. He stated that the plan is to break the installation up <br /> into ten areas. See photos IMG_2348 through IMG-2366. <br /> Additionally, the October 2025 log includes a comment"10/1/25 lift station pump broke flooding secondary <br /> containment by the line". System corrosion/damage and compromised condition of pipes,valves or pumps for the 1 st <br /> through the 3rd was noted in the log. Liquid in the secondary containment was noted from the 1 st through the 16th. No <br /> explanation of how liquid continued to enter the secondary containment after the other compliance issues were <br /> resolved was documented. No follow up corrective action was documented for any of the issues noted in the log. <br /> (Continued in overall inspection comments section at the bottom of the report) <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> OBSERVATION: The HW treatment system for this facility is not being operated properly to meet the requirements of <br /> the regulations. During the inspection, layers of debris resulting from spills were observed inside the secondary <br /> containment. Daily inspection logs indicate multiple leaks incidents and and liquid observed within the secondary <br /> containment.The facility was unable to provide documentation verifying that the issues noted on the inspection logs <br /> were corrected or that the material was removed from the secondary containment.This includes: <br /> -The daily inspection log for February 2024. On the 1 st and 2nd, the question"Is secondary containment free of waste <br /> and liquid?" is marked"No". No comments regarding the source of the liquid or any follow-up action was documented. <br /> -The daily inspection log for April 2025. The log includes a note in the comments section that reads"pipe broke <br /> waiting on parts". Liquid in the secondary containment, system, system corrosion/damage and compromised pipes, <br /> valves or pumps were noted on the checklist on the same days. No corrective action was documented. <br /> -The July 2025 daily inspection log. "No"is marked for the question "Is secondary containment free of waste and <br /> liquid?"on the 30th and 31 st. No comments regarding the source of the liquid or any follow up action was <br /> documented. <br /> -The October 2025 log.The log includes a comment"10/1/25 lift station pump broke flooding secondary containment <br /> by the line". System corrosion/damage and compromised pipes,valves or pumps were noted on Oct 1 st-3rd. <br /> Additionally, liquid in the secondary containment was noted Oct 1 st-16th. No explanation of how liquid continued to <br /> enter the secondary containment after the other issues were resolved was documented. No follow up action was <br /> documented for any of the issues noted in the log. <br /> (Continued in overall inspection comments section at the bottom of the report) <br /> Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.