My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 8:24:35 PM
Creation date
4/16/2026 8:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0543720
PE
2231 - HAZARDOUS WASTE PBR FACILITY
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1325 1 EL PINAL DR STOCKTON 95205
Suite #
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of violations that have not been addressed for METAL <br />FINISHING SOLUTIONS - STOCKTON CA as of April 06, 2026. <br />Open violations from November 04, 2025 inspection <br />OBSERVATION: The hazardous waste treatment tank system secondary containment system is not adequate. During <br />the inspection, the secondary containment for the wastewater treatment area was observed with layers of crystalized <br />and clumped white material, sludge, and wet puddled staining. Multiple sections of ground level piping for the system <br />were observed with a crystalized and caked white substance. Areas of the floor adjacent to and surrounding the <br />bottom rims of multiple tanks were observed to have crystalized and caked layers of a white and yellow substance. <br />The interior walls and top of the secondary containment berm and several components of the sides of components of <br />the treatment system were observed with white staining. The acid drum, caustic drum and mix tanks were observed <br />with dark sludge around their bases and dark splash marks on their walls. Per Allan Rodriguez, Vice President, the <br />facility is in the process of installing epoxy throughout the secondary containment area and they scrape off a small <br />area of debris at a time and dispose of it as hazardous waste. He stated that the plan is to break the installation up <br />into ten areas. See photos IMG_2348 through IMG_2366. <br />Additionally, the October 2025 log includes a comment "10/1/25 lift station pump broke flooding secondary <br />containment by the line". System corrosion/damage and compromised condition of pipes, valves or pumps for the 1st <br />through the 3rd was noted in the log. Liquid in the secondary containment was noted from the 1st through the 16th. No <br />explanation of how liquid continued to enter the secondary containment after the other compliance issues were <br />resolved was documented. No follow up corrective action was documented for any of the issues noted in the log. <br />(Continued in overall inspection comments section at the bottom of the report) <br /> <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />OBSERVATION: The HW treatment system for this facility is not being operated properly to meet the requirements of <br />the regulations. During the inspection, layers of debris resulting from spills were observed inside the secondary <br />containment. Daily inspection logs indicate multiple leaks incidents and and liquid observed within the secondary <br />containment. The facility was unable to provide documentation verifying that the issues noted on the inspection logs <br />were corrected or that the material was removed from the secondary containment. This includes: <br />-The daily inspection log for February 2024. On the 1st and 2nd, the question "Is secondary containment free of waste <br />and liquid?" is marked "No". No comments regarding the source of the liquid or any follow-up action was documented. <br />-The daily inspection log for April 2025. The log includes a note in the comments section that reads "pipe broke <br />waiting on parts". Liquid in the secondary containment, system, system corrosion/damage and compromised pipes, <br />valves or pumps were noted on the checklist on the same days. No corrective action was documented. <br />-The July 2025 daily inspection log. "No" is marked for the question "Is secondary containment free of waste and <br />liquid?" on the 30th and 31st. No comments regarding the source of the liquid or any follow up action was <br />documented. <br />-The October 2025 log. The log includes a comment "10/1/25 lift station pump broke flooding secondary containment <br />by the line". System corrosion/damage and compromised pipes, valves or pumps were noted on Oct 1st-3rd. <br />Additionally, liquid in the secondary containment was noted Oct 1st-16th. No explanation of how liquid continued to <br />enter the secondary containment after the other issues were resolved was documented. No follow up action was <br />documented for any of the issues noted in the log. <br />(Continued in overall inspection comments section at the bottom of the report) <br /> <br />Page 4 of 7
The URL can be used to link to this page
Your browser does not support the video tag.